
Danzhou in Hainan Advances "Nuclear Power to Yangpu" and "Nuclear Steam to Yangpu" to Support Zero-Carbon Industrial Park Development
On September 2, the series of themed press conferences for the "15th Five-Year Plan" kickoff (fifth session at the city and county level) — the Danzhou special session was held. A relevant official from Danzhou stated that during the "15th Five-Year Plan" period, Danzhou will focus on building a new-type power system, a new-type energy system, and zero-carbon industrial parks and low-carbon city development, promoting deep integration of clean energy with port-adjacent industries, and striving to become a national demonstration area for new-type power systems. According to the released content, during the "15th Five-Year Plan" period, Hainan Power Grid plans to invest 5 billion yuan in Danzhou to build a coordinated "transmission-distribution-microgrid" three-tier power grid. By 2030, Danzhou will fully establish a layered, zoned, and independently operated grid framework, promote "nuclear power to Yangpu" to achieve local consumption of green electricity with full-chain traceability and verifiability, reducing the regional power carbon emission factor across the entire area to below 0.05 kgCO₂/kWh.
2026-09-04

Russia's Leningrad NPP resumes hot water supply to Sosnovy Bor
On August 31, 2026, Russia's Leningrad NPP resumed hot water supply to the city of Sosnovy Bor via the district heating station (BRT) after completing scheduled maintenance. Dmitry Tsygankov, workshop manager of the turbine department at Leningrad NPP, stated that the plant had successfully completed BRT-related maintenance work in August, including chemical cleaning of heat exchange equipment, overhaul of pumping equipment, industrial safety assessments, and the necessary hydraulic pressure tests of pipelines. He said that the BRT is now supplying hot water to the city and industrial zone as planned, and the plant is preparing for the scheduled start of the Sosnovy Bor heating system; the heating system will be put into operation once outdoor temperatures drop to the appropriate level.
2026-09-01