CINIE CINIE
中文 | English | Français | Русский
Home CINIE World Nuclear Fusion Nuclear Application

Search Results

Keyword:nuclear power plant fuel handling

Qinshan Nuclear Power Plant Unit 2 Outage 218 Officially Commences

Qinshan Nuclear Power Plant Unit 2 Outage 218 Officially Commences

At 2:20 AM on September 1, Unit 2 of Qinshan Phase II was disconnected from the East China Power Grid, marking the official commencement of Outage 218. This outage is a Category C overhaul for Unit 2 of Qinshan Phase II. In addition to the routine annual overhaul items such as reactor coolant system head removal and installation, fuel handling, SG eddy current inspection and flushing, it also includes important special tasks such as generator rotor removal, insertion and inspection, diesel generator excitation system renovation, PSR weakness anti-boron dilution modification, reactor coolant system automatic makeup and residual heat removal eddy current detection function, and nuclear island low-voltage switchgear renovation. The planned items for this outage total 6,119: including 3,764 preventive items, 171 strategic maintenance items, 789 periodic tests, 133 modification work orders, and 1,262 other types of work.

2026-09-01

Reading Ranking

  • 1 Shimane Nuclear Power Station Unit 2 Resumes Power Generation
  • 2 Multiple African countries push nuclear power projects from planning to financing and construction
  • 3 Busan, South Korea Reports No Abnormal Radiation Detected in Seawater and Seafood Three Years After Fukushima Discharge
  • 4 Russia's Leningrad Nuclear-Powered Icebreaker Electrical Distribution Equipment Passes Inspection
  • 5 U.S. Marathon Fusion Demonstrates Hydrogen and Lithium Isotope Enrichment Technology
  • 6 Korea Atomic Energy Environment Corporation Earns Top Grade A in All Categories of Radioactivity Analysis Capability Evaluation for Nine Consecutive Years
  • 7 Unit 3 of Russia's Kursk Nuclear Power Plant resumes operation after short-term maintenance
  • 8 Finland's Onkalo Spent Fuel Disposal Facility Starts Drilling of First Disposal Hole
  • 9 CNNC Headway's 13C-Urea Synthesis Control Method Patent Wins China Patent Excellence Award
  • 10 Kyoto University and NEDO to Build Dedicated Beamline for Hydrogen Energy Research at SPring-8-II
  • 11 German Team Achieves Ultrafast Shaping of Extreme Ultraviolet Pulses Using High-Density Helium Gas
  • 12 Russian scientists use 3D-printed tungsten grid to improve X-ray imaging quality, potentially reducing patient radiation exposure
  • 13 Dankook University Hospital Introduces Next-Generation Digital PET-CT System to Enhance Precision Diagnosis of Cancer and Other Diseases
  • 14 South Korea Joins IAEA-Facilitated International Framework ATLAS for Maritime Nuclear Energy Cooperation
  • 15 22 Atmospheric Radiation Automatic Monitoring Stations in Shaanxi Operate Stably, with National-Controlled Stations Achieving 99.9% Data Acquisition Rate
CINIE

Organizing Committee of the Shenzhen Nuclear Expo

Telephone: +86 10-67808008

+86 10-68808008

Email: info@cinie.net

CINIE

Event Overview News Center Support Services Highlights Archive Contact Us

World Nuclear

China Nuclear Power News World Nuclear Power News Expert Views Nuclear Power Technology

Fusion

China Fusion World Fusion Big Science Facilities ITER Program Business & Capital

Nuclear Application

Medical Scientific Research Environmental Protection Industry Food Agriculture Security
About us | All rights reserved
CINIE All rights reserved 2026 ICP License:京ICP备12027382号-9