Search Results
Keyword:predictive maintenance
CNNC Qintong Innovatively Builds a Digital-Intelligent Operation and Maintenance Management System for Its Isotope Base
Recently, Chinatom Qinshan Isotope Co., Ltd. (hereinafter referred to as "CNNC Qintong"), centering on the isotope production base construction project, successfully built a digital-intelligent operation and maintenance (O&M) management system with the Integrated Intelligent Production Information Management Platform (IMS) as its core. By empowering full-lifecycle equipment control and intelligent decision-making, the system effectively addresses O&M management pain points in nuclear technology application scenarios with high safety requirements and high complexity. It is understood that the system, with the Integrated Intelligent Production Information Management Platform (IMS) as its management hub, has achieved unified coding and labeling of 6,799 pieces of equipment across the entire plant and "one file per unit" full-lifecycle traceability. By deeply linking equipment ledgers with maintenance plans, repair work orders and spare parts management, CNNC Qintong has not only driven the upgrade of its maintenance model toward condition monitoring and predictive maintenance, but also achieved significant cost reduction, efficiency improvement and energy consumption optimization through HVAC variable-frequency renovation and self-developed automatic calibration platforms.
2026-10-22
Shidaowan Nuclear Power Company Successfully Completes Member Support Activity for Predictive Maintenance and Equipment Condition Monitoring
On July 24, Shidaowan Nuclear Power Company successfully completed the member support activity for predictive maintenance and equipment condition monitoring, laying the foundation for further optimizing the predictive maintenance and equipment condition monitoring management and technical systems of the High-Temperature Gas-Cooled Reactor (HTGR) Demonstration Project, and promoting the transformation and upgrading of the equipment management model. The member support activity, lasting five days, was organized by the Nuclear Power Branch of the China Nuclear Energy Association, aiming to leverage the expertise of industry experts to drive the transformation of the equipment management model of the HTGR Demonstration Project from breakdown maintenance and periodic maintenance to data-driven predictive management, thereby strengthening the foundation of nuclear safety and operational economy. The expert team for this activity was led by Chen Lunshou, former Deputy Chief Engineer of Sanmen Nuclear Power Co., Ltd...
2026-07-30