Search Results
Keyword:DDS
UK's Babcock Adds Quest Global to Engineering Services Framework Including Nuclear Energy
Quest Global Engineering Services Limited announced on August 26 that it has been included in Babcock International Group's engineering services framework, further expanding engineering collaboration between the two companies in areas such as nuclear energy. Under the agreement, the engineering services framework has a term of five years. The two parties have been collaborating since 2023 across project areas including nuclear, marine, aviation, land, and mission systems. This inclusion in the framework is seen as part of Babcock's efforts to build closer, longer-term relationships with key suppliers. Gareth Watson, Quest Global's strategic business lead...
2026-08-27
Atom High-Tech Adds New Radiopharmaceutical Production Base in Changchun
The Jilin Provincial Medical Products Administration issued a public notice on August 21 stating that, in accordance with the Drug Administration Law of the People's Republic of China, the Regulations on the Administration of Radiopharmaceuticals, the Measures for the Supervision and Administration of Drug Production, and other relevant provisions, following on-site inspection and review approval, it intends to issue the Radiopharmaceutical Production License to Changchun Atom High-Tech Pharmaceutical Co., Ltd. The public notice period is 5 working days, subject to public supervision. The notice information shows that the registered address of Changchun Atom High-Tech Pharmaceutical Co., Ltd. is located at No. 770 Shengye Road, Beihu Science and Technology Development Zone, Changchun City, Jilin Province, and the proposed production address for the license is consistent with the registered address. The proposed production scope for this license is small-volume injections for in vivo radiopharmaceuticals, involving products such as Sodium Pertechnetate [99mTc] Injection, Technetium [99mTc] Methylenediphosphonate Injection, Technetium [99mTc] Methoxyisonitrile Injection, Technetium [99mTc] Pentetate Injection, Technetium [99mTc] Ethyl Cysteinate Dimer Injection, and Technetium [99mTc] Etifenin Injection.
2026-08-24
Dongcheng Pharmaceutical Adds New Radiopharmaceutical Production Center in Jinzhong, Shanxi
Recently, Shanxi Andike, a subsidiary of Dongcheng Andike, which is a wholly-owned subsidiary of Dongcheng Pharmaceutical, received the "Radiopharmaceutical Production License" issued by the Shanxi Provincial Drug Administration. This marks that the Jinzhong Radiopharmaceutical Production Center in Shanxi has met the requirements for commissioning, adding a new facility to Dongcheng Pharmaceutical's radiopharmaceutical production network. As one of China's leading nuclear medicine companies, the group adheres to a layout strategy of "networked short half-life and base-based long half-life" production, and has established a domestically leading radiopharmaceutical production and distribution network. To date, the group has put 33 radiopharmaceutical production centers into operation. As a heparin expert and radiopharmaceutical pioneer, Dongcheng Pharmaceutical will continue to deepen its presence in the nuclear medicine field, striving to build a comprehensive Dongcheng nuclear medicine ecosystem...
2026-08-18
South Korea's semiconductor cluster adds about 21 GW of new power demand; government to study whether to build new nuclear units
South Korea's Minister of Climate, Energy and Environment, Kim Sung-hwan, said on the 10th that the new electricity demand from the Yongin—Hoseon semiconductor industry cluster is approximately 21 GW, equivalent to the power supply capacity of about 15 nuclear units based on an estimate of 1.4 GW per unit. The Ministry of Climate, Energy and Environment plans to seek expert and public opinions before announcing the 12th Basic Plan for Electricity Supply and Demand in October, and will decide accordingly whether to push for the construction of new nuclear units. Kim Sung-hwan stated that the electricity demand of the semiconductor industry has increased significantly compared to the past. The South Korean government has decided to raise renewable energy capacity from 78 GW to 100 GW by 2030, but whether the increase in renewable energy alone can meet the new demand still requires further assessment.
2026-08-11
Russian Far East nuclear submarine base adds anti-drone nets, unmanned equipment protection prompts adjustments across multiple platforms
Satellite imagery shows Russia has installed anti-drone protective nets over multiple nuclear submarines at the Vilyuchinsk naval base on the Kamchatka Peninsula. The base hosts the Pacific Fleet's nuclear submarine deployment. A total of eight moored submarines are covered by the protection, including Borei-class and Borei-A-class ballistic missile submarines, as well as Oscar-class, Yasen-class, and Akula-class attack submarines. The protective installations consist mainly of L-shaped steel frames along the piers and retractable netting. When submarines are berthed, the nets can cover the upper hull; before submarines depart port, the netting is rolled up and stowed. Such facilities cannot withstand long-range cruise drones or heavy missile strikes, but can provide a degree of physical shielding against low-cost threats such as small FPV drones and improvised unmanned devices. The Russian side has also deployed double-layer floating barriers on the outer side of the mooring area to prevent unmanned surface vessels from entering the harbor.
2026-08-10
American Fusion Adds Six New Patent Applications for Texatron Fusion Technology
On August 6, American Fusion announced that it has filed six new patent applications in the United States covering multiple technical aspects of its proprietary Texatron Fusion Engine platform. This brings the company's total number of patent applications filed in the U.S. to 82. American Fusion stated that these applications continue its strategy of building an intellectual property portfolio around the Texatron platform, covering reactor architecture, plasma confinement, electromagnetic systems, fuel delivery, reactor control, power management, and related engineering technologies supporting the continued development and future commercialization of the Texatron Fusion Engine. The company's Chief Legal Officer, Michael G....
2026-08-07
SNPAS Completes Shipment of First Batch of Cabinets for PLS and DDS Systems of Lianjiang Nuclear Power Unit 2
Recently, witnessed by Zhanjiang Nuclear Power and Shanghai Nuclear Engineering Research and Design Institute (SNERDI), SNPAS successfully completed the delivery of the first batch of cabinets for the Plant Control System (PLS) and Data Display and Processing System (DDS) of Unit 2 of the Guangdong Lianjiang Nuclear Power Project Phase I, with the equipment having arrived at the project site smoothly. Sun Mingjun, Member of the Party Committee and Deputy General Manager of Zhanjiang Nuclear Power, Liu Xin, Deputy General Manager of SNPAS, and Zhou Xu, Deputy General Manager of the Procurement Center of SNERDI, attended the shipment ceremony. This shipment marks an important milestone in the execution of the instrumentation and control (I&C) system for Unit 2, signifying that the main I&C equipment has officially entered the stage of batch delivery and on-site installation preparation. The shipment of Unit 2 follows the mature experience of Unit 1 in...
2026-08-06
SNPAS Completes Shipment of First Batch of Cabinets for PLS and DDS Systems of Lianjiang Nuclear Power Unit 2
Recently, witnessed by Zhanjiang Nuclear Power and Shanghai Nuclear Engineering Research and Design Institute (SNERDI), SNPAS successfully completed the shipment and delivery of the first batch of cabinets for the Plant Control System (PLS) and Data Display and Processing System (DDS) of Unit 2 of the Phase I project of Guangdong Lianjiang Nuclear Power Project, with the equipment having arrived at the project site smoothly. Sun Mingjun, Member of the Party Committee and Deputy General Manager of Zhanjiang Nuclear Power, Liu Xin, Deputy General Manager of SNPAS, and Zhou Xu, Deputy General Manager of the Procurement Center of SNERDI, attended the shipment ceremony. This shipment marks an important milestone in the implementation of the instrumentation and control (I&C) system for Unit 2, signifying that the main I&C equipment has officially entered the phase of batch delivery and on-site installation preparation. The shipment of Unit 2 continues the...
2026-08-06