CINIE CINIE
中文 | English | Français | Русский
Home CINIE World Nuclear Fusion Nuclear Application

Search Results

Keyword:containment shell

Installation of the fifth tier of the inner containment shell begins at Unit 1 of Egypt's El Dabaa Nuclear Power Plant

Installation of the fifth tier of the inner containment shell begins at Unit 1 of Egypt's El Dabaa Nuclear Power Plant

The Egyptian Nuclear Power Plants Authority (NPPA) recently announced that installation of the fifth tier of the inner containment shell in the reactor building of Unit 1 at the El Dabaa Nuclear Power Plant has commenced. This marks a significant milestone in the civil construction and installation work for the unit. The inner containment shell is a cylindrical structure designed to house the nuclear reactor and related primary circuit equipment of the nuclear power plant. The fifth tier being installed consists of 12 components, all prefabricated on-site at the El Dabaa plant. Each component is 7.5 meters high and weighs approximately 40 to 45 tons, depending on its structural configuration. As planned, the installation of the fifth tier is expected to be completed within two weeks. Subsequently, the remaining tiers will continue to be assembled to form the complete annular inner containment structure. A heavy-duty crane with a lifting capacity of 2,200 tons will be used for the lifting operations at the construction site...

2026-08-17

Reading Ranking

  • 1 Innovating the Safety Review Pathway to Strengthen the Safety Foundation of High-Temperature Gas-Cooled Reactors — National Nuclear Safety Administration Approves Safety Design Criteria for High-Temperature Gas-Cooled Reactors
  • 2 Strengthen Regulation of Fusion Devices, Empower the Development of New Technologies
  • 3 The Fully Superconducting Tokamak EAST Marks 20 Years of Operation: From a 3-Second First Cry to Thousand-Second Steady State, China's "Artificial Sun" Opens a Leap Toward Fusion Engineering
  • 4 National Standard "Test Methods for Plasma Parameters (GB/T 48094—2026)" Led by the University of Science and Technology of China Officially Released, Solidifying the Standardization Foundation for Controlled Nuclear Fusion and High-Tech Industries
  • 5 Chashma Nuclear Power Plant Unit 1 in Pakistan Sets a New Record of 427 Consecutive Days of Trouble-Free Operation
  • 6 Construction of the "Helong-2" project begins, advancing toward hydrogen-boron fusion power generation
  • 7 South Korea and Westinghouse Electric Plan to Advance Cooperation on 8 Nuclear Power Plants in the U.S.
  • 8 KAERI and IAEA Jointly Hold Research Reactor Ageing Management Training Workshop
  • 9 US Company DTE Advances 177 MW Power Uprate at Fermi 2 Nuclear Power Plant
  • 10 China Institute of Atomic Energy Holds 2026 Science and Technology Innovation Conference, Releases Three Independently Developed Scientific and Technological Achievements: Industrial Software, Radiation-Resistant Robot, and Monitoring Watch
  • 11 Alexey Likhachev: The situation at the Zaporozhye Nuclear Power Plant is severe; the IAEA should not merely stop at recording attacks and issuing danger warnings
  • 12 ITER Tritium Plant Completes Final Design, Fully Transitions to Equipment Manufacturing, Installation, and Commissioning
  • 13 U.S. Deployable Energy Microreactor Selected for Two Nuclear Energy Demonstration Projects
  • 14 U.S. Develops Refractory Metal Powder Atomization System to Support Fusion Energy Materials Research
  • 15 Two US Companies Partner to Bring AI to Nuclear Power Plant Simulation Training
CINIE

Organizing Committee of the Shenzhen Nuclear Expo

Telephone: +86 10-67808008

+86 10-68808008

Email: info@cinie.net

CINIE

Event Overview News Center Support Services Highlights Archive Contact Us

World Nuclear

China Nuclear Power News World Nuclear Power News Expert Views Nuclear Power Technology

Fusion

China Fusion World Fusion Big Science Facilities ITER Program Business & Capital

Nuclear Application

Medical Scientific Research Environmental Protection Industry Food Agriculture Security
About us | All rights reserved
CINIE All rights reserved 2026 ICP License:京ICP备12027382号-9