CINIE CINIE
中文 | English | Français | Русский
Home CINIE World Nuclear Fusion Nuclear Application

Search Results

Keyword:main coolant pump

Finland's Olkiluoto 3 unit reduces power output due to main coolant pump fault

Finland's Olkiluoto 3 unit reduces power output due to main coolant pump fault

Finnish utility Teollisuuden Voima (TVO) said on August 17 that Unit 3 of the Olkiluoto nuclear power plant (OL3) will continue to operate at a stable power output of approximately 1,300 MW, about 84% of full capacity, for the coming weeks due to technical faults in two main coolant pumps in the nuclear island. The unit's rated generating capacity is approximately 1,600 MW. TVO stated that the faults were discovered during this summer. Since then, the unit has reduced its output power and investigations have been conducted into the causes of the faults and corrective measures. Under the latest arrangement, OL3 will continue operating at a reduced power level to monitor the effectiveness of corrective actions until the unit begins its scheduled annual outage on September 10, 2026. TVO...

2026-08-18

Reading Ranking

  • 1 Innovating the Safety Review Pathway to Strengthen the Safety Foundation of High-Temperature Gas-Cooled Reactors — National Nuclear Safety Administration Approves Safety Design Criteria for High-Temperature Gas-Cooled Reactors
  • 2 The 4th refueling overhaul of Tianwan Nuclear Power Unit 6 officially begins
  • 3 Strengthen Regulation of Fusion Devices, Empower the Development of New Technologies
  • 4 Bechtel and Westinghouse Consortium Formally Signs EPC Turnkey Contract for Poland's First Nuclear Power Plant, Construction Scheduled to Begin in 2027
  • 5 The Fully Superconducting Tokamak EAST Marks 20 Years of Operation: From a 3-Second First Cry to Thousand-Second Steady State, China's "Artificial Sun" Opens a Leap Toward Fusion Engineering
  • 6 Standard Technical Specifications for Passive Nuclear Power Plants, Chiefly Compiled Under the Leadership of Shanghai Nuclear Engineering Research and Design Institute, Officially Released
  • 7 Chashma Nuclear Power Plant Unit 1 in Pakistan Sets a New Record of 427 Consecutive Days of Trouble-Free Operation
  • 8 National Standard "Test Methods for Plasma Parameters (GB/T 48094—2026)" Led by the University of Science and Technology of China Officially Released, Solidifying the Standardization Foundation for Controlled Nuclear Fusion and High-Tech Industries
  • 9 Construction of the "Helong-2" project begins, advancing toward hydrogen-boron fusion power generation
  • 10 South Korea and Westinghouse Electric Plan to Advance Cooperation on 8 Nuclear Power Plants in the U.S.
  • 11 KAERI and IAEA Jointly Hold Research Reactor Ageing Management Training Workshop
  • 12 US Company DTE Advances 177 MW Power Uprate at Fermi 2 Nuclear Power Plant
  • 13 China Institute of Atomic Energy Holds 2026 Science and Technology Innovation Conference, Releases Three Independently Developed Scientific and Technological Achievements: Industrial Software, Radiation-Resistant Robot, and Monitoring Watch
  • 14 Alexey Likhachev: The situation at the Zaporozhye Nuclear Power Plant is severe; the IAEA should not merely stop at recording attacks and issuing danger warnings
  • 15 U.S. Develops Refractory Metal Powder Atomization System to Support Fusion Energy Materials Research
CINIE

Organizing Committee of the Shenzhen Nuclear Expo

Telephone: +86 10-67808008

+86 10-68808008

Email: info@cinie.net

CINIE

Event Overview News Center Support Services Highlights Archive Contact Us

World Nuclear

China Nuclear Power News World Nuclear Power News Expert Views Nuclear Power Technology

Fusion

China Fusion World Fusion Big Science Facilities ITER Program Business & Capital

Nuclear Application

Medical Scientific Research Environmental Protection Industry Food Agriculture Security
About us | All rights reserved
CINIE All rights reserved 2026 ICP License:京ICP备12027382号-9