CINIE CINIE
中文 | English | Français | Русский
Home CINIE World Nuclear Fusion Nuclear Application

Search Results

Keyword:MERALCO

Manila Electric Company Advances Small Modular Reactor Feasibility Study in the Philippines

Manila Electric Company Advances Small Modular Reactor Feasibility Study in the Philippines

Manila Electric Company (Meralco) and its power generation arm, Meralco PowerGen Corporation (MGEN), have commissioned U.S. engineering firm Sargent & Lundy and its Philippine local partner, AMH Philippines Inc. (AMH), to conduct a comprehensive feasibility study on Small Modular Reactors (SMRs). MGEN announced on September 1 (local time) that the study is part of a $2.8 million technical assistance program provided by the U.S. Trade and Development Agency (USTDA). The program was officially announced in February 2026, with the goal of completing the study by the fourth quarter of 2027...

2026-09-01

Reading Ranking

  • 1 Morehead State University Receives $50,000 Grant to Support Nuclear Medicine Technology Bachelor's Program
  • 2 World Nuclear Industry Status Report: The Global "Nuclear Renaissance" Is in Fact "Single-Engine Driven by China," with Regions Outside China in "Substantial Stagnation"
  • 3 NASA's SR-1 Freedom deep-space nuclear reactor progresses smoothly, planned to set sail in 2028
  • 4 Russia's Kola NPP Launches Construction of Nuclear-Powered Hydrogen Production Pilot Complex
  • 5 NRC Approves Holtec's Alternative Plan to Remove Tilted Fuel Assembly at Palisades Nuclear Power Plant
  • 6 Rosatom and Indonesia Reach Historic Agreement to Implement First Floating Nuclear Power Plant Power Supply Export Project
  • 7 U.S. Marathon Fusion Demonstrates Hydrogen and Lithium Isotope Enrichment Technology
  • 8 MOST Sets the Pathway for Hard-Core Science and Technology Breakthroughs in the "15th Five-Year Plan": Comprehensive and Systematic Deployment of Major Basic Research on Controlled Nuclear Fusion to Solidify the Foundation of Future Strategic Energy
  • 9 Russia Completes Qualification Tests of ITER First Wall Tungsten Lining, Advancing Development of Key Components for International Thermonuclear Fusion
  • 10 "Power-Hungry Beast" Reshapes the Logic of Power Asset Revaluation: Can Tech Giants' 20-Year Long-Term Agreements Fundamentally Resolve the Nuclear Power Economics Dilemma?
  • 11 Environmental Impact Reports for Multiple Nuclear Energy Projects Including Huakun-1 Approved
  • 12 Oklo Advances Construction of Groves-2 Forge Isotope Pilot Facility, Deepening Medical and Industrial Isotope Layout
  • 13 KhimMed to Build Large-Scale Electrolyte Plant for Rosatom, Securing Supply Chain for Gigafactories
  • 14 Beloyarsk NPP BN-600 Unit 3 Reaches Full Power After Maintenance, New Liquid Sodium Electromagnetic Pump Commissioned
  • 15 French Nuclear Safety and Radiation Protection Authority Approves Exemption of ITER Vacuum Vessel from Fission Pressurized Equipment Regulation
CINIE

Organizing Committee of the Shenzhen Nuclear Expo

Telephone: +86 10-67808008

+86 10-68808008

Email: info@cinie.net

CINIE

Event Overview News Center Support Services Highlights Archive Contact Us

World Nuclear

China Nuclear Power News World Nuclear Power News Expert Views Nuclear Power Technology

Fusion

China Fusion World Fusion Big Science Facilities ITER Program Business & Capital

Nuclear Application

Medical Scientific Research Environmental Protection Industry Food Agriculture Security
About us | All rights reserved
CINIE All rights reserved 2026 ICP License:京ICP备12027382号-9