CINIE CINIE
中文 | English | Français | Русский
Home CINIE World Nuclear Fusion Nuclear Application

Search Results

Keyword:Sava River water temperature

Krško Nuclear Power Plant to Reduce Power Output Due to Sava River Water Temperature Pressure

Krško Nuclear Power Plant to Reduce Power Output Due to Sava River Water Temperature Pressure

The Krško Nuclear Power Plant (Krško NPP) announced that, due to persistent abnormal hydrological and meteorological conditions in the Sava River, it will begin gradually reducing reactor power from the evening of August 6 to prevent river water temperatures from exceeding environmental standards. In the first phase, the unit's power output will be reduced to 80% of its maximum generating capacity. The plant stated that this power reduction is a planned, controlled, and temporary measure aimed at ensuring the Sava River water temperature remains within permissible limits. Relevant environmental standards stipulate that the daily average water temperature must not exceed 28 degrees Celsius, and the temperature increase of the river water caused by the plant's operation must not exceed 3 degrees Celsius. The management of the Krško Nuclear Power Plant also stated...

2026-08-06

Reading Ranking

  • 1 US Intermountain Health Opens New Outpatient Clinic in Las Vegas, Equipped with PET/CT and Linear Accelerator
  • 2 UC Santa Barbara and Lawrence Livermore National Laboratory Collaborate to Accelerate Fusion Plasma Simulations with AI
  • 3 University of Science and Technology of China Plans to Establish a Micro-Major in "Magnetic Confinement Controlled Nuclear Fusion"
  • 4 Hong Kong deputies to the National People's Congress visit Hefei to inspect fusion device and innovation industry development
  • 5 Arkansas Advances New Nuclear Power Plant Project, Hyundai Motor Supports SMR Construction
  • 6 Approximately 13,000 liters of water found in Unit 3 of Hamaoka Nuclear Power Plant; Chubu Electric continues investigation into data falsification
  • 7 Nuvora Completes Independent Review of Pre-Feasibility Study for 300 MWth High-Temperature Gas-Cooled Reactor Hydrogen Production
  • 8 Vietnam to Develop 88 National Standards and 6 National Regulations Supporting Nuclear Power and Atomic Energy Applications from 2026–2030
  • 9 Uranium "Breakthrough" in Poland's Świętokrzyskie Mountains Falls Short, Industria Announces Canadian Lab Results and Halts Exploration
  • 10 WANO Peer Review Successfully Conducted for Hainan Nuclear Power Units 1 and 2
  • 11 Westinghouse and Amentum Expand Cooperation to Support Scaled Deployment of APX Technology Platform
  • 12 Shimane Nuclear Power Plant Unit 2 Completes Fuel Replacement and Installs Containment Vessel Head
  • 13 News Broadcast: Major Science Infrastructure Construction Accelerates Across the Board, Innovative Achievements Emerge
  • 14 Lifting Task of Large Storage Tanks in Cryogenic System Tank Area of HL-3 Upgrade Project Successfully Completed
  • 15 U.S. Team Proposes New In-Situ Cleaning Method for Porous Tungsten Walls in Fusion Devices
CINIE

Organizing Committee of the Shenzhen Nuclear Expo

Telephone: +86 10-67808008

+86 10-68808008

Email: info@cinie.net

CINIE

Event Overview News Center Support Services Highlights Archive Contact Us

World Nuclear

China Nuclear Power News World Nuclear Power News Expert Views Nuclear Power Technology

Fusion

China Fusion World Fusion Big Science Facilities ITER Program Business & Capital

Nuclear Application

Medical Scientific Research Environmental Protection Industry Food Agriculture Security
About us | All rights reserved
CINIE All rights reserved 2026 ICP License:京ICP备12027382号-9