Search Results

Keyword:Special Supervision

South China Regional Office of the National Nuclear Safety Administration Conducts Special Supervision and Inspection of Changjiang Units Under Construction

South China Regional Office of the National Nuclear Safety Administration Conducts Special Supervision and Inspection of Changjiang Units Under Construction

As the South China region enters the main flood season with concentrated typhoons and heavy rainfall, nuclear facilities face significant pressure in resisting meteorological disasters, and safety control responsibilities are critical. To rigorously prevent nuclear safety risks triggered by natural disasters during the flood season and to reinforce the primary responsibility of operating entities for safety production, the South China Regional Office of the National Nuclear Safety Administration (hereinafter referred to as the South China Regional Office) made advance deployments and carried out a special supervision and inspection of typhoon and flood prevention for the Changjiang units under construction in an unannounced manner. This inspection comprehensively verified the effectiveness of control measures, tightened the primary responsibility of the operating entity, and effectively built a safety barrier for nuclear facilities during the flood season. Inspectors went deep into the construction sites of Units 3 and 4 of the Changjiang Nuclear Power Plant and the small modular reactor demonstration project, focusing on checking nuclear...

2026-07-31

Ministry of Ecology and Environment's North China Nuclear and Radiation Safety Supervision Station Conducts Special Supervision on Cold Test Release for Tianwan Nuclear Power Unit 8

Ministry of Ecology and Environment's North China Nuclear and Radiation Safety Supervision Station Conducts Special Supervision on Cold Test Release for Tianwan Nuclear Power Unit 8

The Cold Functional Test (hereinafter referred to as the cold test) is the first major comprehensive test for a nuclear power unit transitioning from the installation phase to the commissioning phase. It is a key core link to verify the pressure-bearing capacity and sealing performance of the nuclear island main system and equipment under design pressure conditions, and serves as a critical milestone to ensure the subsequent safe and stable operation of the unit. Recently, the Ministry of Ecology and Environment's North China Nuclear and Radiation Safety Supervision Station (hereinafter referred to as the North China Supervision Station) conducted comprehensive supervision on the cold test control point release for Tianwan Nuclear Power Plant Unit 8. Adhering to the principle of supervision moving forward, the station consolidated the pre-test foundation. Upholding the nuclear safety supervision philosophy of "prevention first, moving the checkpoint forward," the North China Supervision Station focused on the preconditions for the cold test control point release, verified various items pending rectification one by one, and ensured that all hidden dangers were effectively addressed, building a solid safety barrier for the smooth progress of subsequent tests.

2026-07-30