Search Results
Keyword:Vietnam nuclear power
Phu Tho Province, Vietnam Advances Improvement of Radiation and Nuclear Accident Emergency Response Plan
On the morning of August 13, the Department of Science and Technology of Phu Tho Province, in coordination with the Vietnam Union of Science and Technology Associations and the Institute for Technology and Radiation Application, held a scientific seminar to solicit opinions on the draft of the "Radiation and Nuclear Accident Emergency Response Plan of Phu Tho Province." Experts, scientists, and representatives from relevant provincial and municipal departments were invited to attend, aiming to ensure the plan's feasibility, alignment with local conditions, and compliance with national requirements for atomic energy management and radiation safety. The core purpose of this seminar was to improve the emergency response plan through multi-party input, making it more suitable for local realities and meeting the requirements of atomic energy application, radiation safety, and nuclear safety management. From the local perspective, the application of radiation technology in Phu Tho Province has already reached a certain scale. Currently, the province has more than 270 institutions using radiation, equipped with over 417 X-ray machines, 2 linear accelerators, more than 500 radiation devices, and 45 radioactive sources, widely applied in fields such as medicine, industry, technical inspection, and scientific research. These technologies have played an active role in enhancing diagnostic and treatment capabilities, improving labor productivity, upgrading product quality, and serving economic and social development.
2026-08-14
Vietnam accelerates nuclear power workforce training, Ninh Thuan 1 project targets commercial operation in 2037-2038
On the afternoon of August 12, Vietnam's Deputy Minister of Education and Training Pham Quang Hung held a working meeting with Vietnam Electricity (EVN) to focus on the implementation of human resource training plans in the nuclear power sector. EVN Deputy General Director Nguyen Tai Anh stated that the group has preliminarily identified 120 key positions required for nuclear power plant operation, as well as 320 core personnel who currently need training and reserve development. As Vietnam plans to build a workforce meeting nuclear power operation requirements by 2035, relevant training must be planned as early as possible and accelerated. The Ninh Thuan 1 Nuclear Power Project is Vietnam's first nuclear power project, with EVN as the investor. The project was suspended in 2016 due to national resource coordination needs, and was restarted at the end of 2024 in accordance with...
2026-08-13
Vietnam's National Assembly Reviews Agreements Related to the Ninh Thuan Nuclear Power Plant Project
On August 13, the Vietnamese National Assembly discussed at its session the proposal for ratifying agreements related to the Ninh Thuan nuclear power plant project. This topic is one of the key items on the agenda of the first extraordinary session, involving the procedures for ratifying international agreements required for the advancement of the nuclear power project, and also reflecting the continued progress of Vietnam's policy arrangements in energy security and large-scale infrastructure development. On the same day, the National Assembly also discussed draft amendments and supplements to certain provisions of the Law on Radio Frequencies, the Law on Telecommunications, the Law on Electronic Transactions, and the Law on Technology Transfer. Vu Hai Quan, member of the Central Committee of the Communist Party of Vietnam and Minister of Science and Technology, stated that the draft law does not alter the scope and subjects of application of the four existing laws, but focuses on resolving...
2026-08-13
Vietnam's National Assembly Reviews Approval of Agreements Related to the Ninh Thuan Nuclear Power Project on the Afternoon of August 11
On the afternoon of August 11, the Vietnamese National Assembly continued the agenda of its first extraordinary session, with the latter half of the proceedings turning to the approval procedures for agreements related to the Ninh Thuan Nuclear Power Plant project. The Vice President of Vietnam, on behalf of the President, submitted a proposal regarding the approval of the relevant agreements; the Minister of Justice, authorized by the Prime Minister, delivered an explanatory report on the agreements; and the Chairman of the National Assembly's Committee for National Defense, Security, and Foreign Affairs submitted a review report. This arrangement indicates that the Ninh Thuan nuclear power project involves not only energy development but also a comprehensive assessment at the legal, diplomatic, security, and national strategic levels. Before the conclusion of the afternoon session, National Assembly deputies held group discussions on the proposal to approve the agreements related to the Ninh Thuan Nuclear Power Plant project. The group discussions...
2026-08-12
Land clearance obstacles hamper Vietnam's Ninh Thuan nuclear power project; Khanh Hoa province establishes task force to advance land handover
August 7, 2026, according to the Vietnam News Agency, Vietnam's Ninh Thuan 1 and Ninh Thuan 2 nuclear power plant projects are entering an accelerated construction phase, but land clearance, compensation, and resident resettlement remain the main bottlenecks affecting progress. In accordance with the requirements of the Vietnamese Prime Minister, Khanh Hoa province is responsible for advancing Component Projects 1 and 2 supporting the two nuclear power projects, namely land acquisition and site clearance, and resettlement work. Although the provincial government has repeatedly set clear land handover targets and timelines, in actual implementation, especially at the Ninh Thuan 1 nuclear power project located in Phuoc Dinh Commune, numerous complex issues continue to arise in planning, compensation, land ownership verification, and on-site handover, causing progress to fall short of expectations. The prominent contradictions of the Ninh Thuan 1 project...
2026-08-09
Petrovietnam Calls for Synchronized Regulation and Development in Ninh Thuan 2 Nuclear Power Project
Petrovietnam has proposed adopting a synchronized coordination mechanism in the development of the Ninh Thuan 2 nuclear power project. The Group believes that for this nuclear power plant project, regulatory, licensing, and inspection procedures should proceed in parallel with the project development process during the investment preparation phase. This approach can enhance document quality, control risks, and ensure the project is implemented safely and in compliance with standards. Petrovietnam emphasized that nuclear power projects require regulatory work (including licensing, assessment, and review) to be integrated into all stages of the project lifecycle, rather than being treated as a subsequent step. The Vietnam Oil and Gas Group proposed that, to effectively advance project preparation, regulatory capacity building should be strengthened...
2026-08-06
Vietnam Issues 470 International Nuclear Energy Standards Covering the Full Chain of Nuclear Power Plants, Research Reactors, SMRs, and Radiation Protection
Vietnam is preparing for nuclear energy development, with the Ministry of Science and Technology recently issuing a list of 470 international and foreign standards directly applicable to the atomic energy sector. These standards cover multiple aspects including safety, design, operation, equipment, personnel, radiation protection, nuclear security, and accident response, aiming to ensure the safe and reliable operation of nuclear facilities throughout their entire lifecycle. The list encompasses requirements across a wide range of fields, from nuclear power plants and research reactors to fuel technology, monitoring systems, radioactive waste management, and nuclear security. For nuclear power plants, the standards cover analysis, safety assessment, design, commissioning, equipment classification, accident management, aging management, maintenance...
2026-08-06
Vietnam's Ministry of Science and Technology and Canada's Saskatchewan Province Strengthen Cooperation on Peaceful Use of Nuclear Technology
Vietnam and Canada's Saskatchewan Province are cooperating on the peaceful use of nuclear technology. Officials from both sides met in Hanoi on August 5, 2026, to discuss directions for cooperation in science, technology, and innovation, particularly in advanced nuclear technology. The Vietnamese side stated that as Vietnam's energy demand grows, ensuring a stable, green, and clean energy supply is of paramount importance, expressing strong interest in research on small modular reactors (SMRs) as well as CANDU reactor technology. During the meeting, both sides discussed strengthening cooperation among regulatory agencies, legal departments, and research organizations in the nuclear technology field, covering legal framework development, technical standards, nuclear safety and safeguards assessment licensing, accident response, and...
2026-08-06
Vietnam to Develop 88 National Standards and 6 National Regulations Supporting Nuclear Power and Atomic Energy Applications from 2026–2030
Vietnam will develop standards and regulations for nuclear power development to support the construction of future nuclear power plants and advancements in atomic energy applications. To align with this goal, the country plans to establish 88 national standards and 6 national regulations during the period from 2026 to 2030, covering key areas such as nuclear power plant safety, radiation safety, environmental monitoring, and related equipment. These standards will reference existing practical experience from the International Atomic Energy Agency (IAEA), the International Organization for Standardization (ISO), and the International Electrotechnical Commission (IEC), and will be periodically reviewed and adjusted based on project progress and actual management needs. The development of these standards is carried out in four phases, each with clearly defined focal objectives...
2026-08-05
Vietnam Electricity Group Plans to Train Over 2,000 Specialists for Ninh Thuan 1 Nuclear Power Project
Vietnam Electricity Group (EVN) has launched a talent assurance program for the Ninh Thuan 1 Nuclear Power Project, aiming to train over 2,000 specialists for the construction, operation, and maintenance of the facility. As Vietnam's first nuclear power project, the Ninh Thuan 1 Nuclear Power Project must simultaneously address key issues such as the legal framework, project financing, restructuring of implementing agencies, and acceleration of investment preparation while advancing human resource readiness. EVN stated that it is cooperating with the Ministry of Education and Training, international nuclear technology partners, and relevant institutions with nuclear energy experience to develop a systematic education and training program for Ninh Thuan 1 Nuclear Power Project personnel. According to preliminary arrangements, the project management organization will require approximately 400 personnel, responsible for construction investment, technical,...
2026-08-04
Vietnam's National Assembly Committee on Defense, Security and Foreign Affairs officially reviews approval contents related to Ninh Thuan Nuclear Power Plant
On the morning of July 31, the National Assembly's Committee for Defense, Security and Foreign Affairs of Vietnam officially commenced the review of approval contents related to the Ninh Thuan Nuclear Power Plant. At the plenary session held at the National Assembly office building, the Committee's Standing Board convened its second formal review meeting to approve contents related to the Ninh Thuan Nuclear Power Plant. The meeting was chaired by Le Tan Toi, member of the Party Central Committee and Chairman of the Committee for Defense, Security and Foreign Affairs, with Vu Hai Ha, member of the Party Central Committee and Standing Vice Chairman of the Committee for Defense, Security and Foreign Affairs, responsible for the organization and coordination of the meeting. At the meeting, representatives from the Office of the President submitted relevant reports, and leaders from the Ministry of Industry and Trade also delivered presentations. Participants...
2026-08-01
Changwon National University and Vietnam Atomic Energy Institute Join Forces to Promote Korea-Vietnam Nuclear Power Industry Synergy
Changwon National University announced that a delegation from the Vietnam Atomic Energy Institute recently visited the university for in-depth discussions on the development of Vietnam's nuclear power industry and cooperation plans in the field of small modular reactors (SMRs). The delegation was led by Dr. Phan Viet Cuong, Deputy Director of VINATOM, among others. The visit came at a time when the Vietnamese government has been comprehensively promoting the introduction of SMRs as a core national energy strategy since 2024. Through the consultations, both sides reached a consensus on close cooperation to strengthen Vietnam's nuclear power technology competitiveness and foster the next-generation SMR industry. In particular, centered on Changwon National University's "SMR² Platform National Research Institute," customized educational programs will be operated for Vietnamese researchers and students...
2026-08-01
Korea and UAE Eye Joint Bid for Vietnam's Ninh Thuan 2 Nuclear Power Project
A South Korean team comprising the Korean government, Korea Electric Power Corporation (KEPCO), and Korea Hydro & Nuclear Power (KHNP) is seeking cooperation with the United Arab Emirates (UAE) to jointly compete for Vietnam's nuclear power project. The proposed plan aims to combine South Korea's experience in large-scale nuclear power plant construction with the UAE's financial strength to enhance both parties' competitiveness in the international nuclear power market. According to sources from South Korea's nuclear power industry, the Ministry of Trade, Industry and Energy (MOTIE) held a high-level meeting with Vietnam's Ministry of Industry and Trade (MOIT) in Hanoi earlier this month, proposing a joint South Korea-UAE participation in the construction of Vietnam's Ninh Thuan 2 Nuclear Power Project. The Ninh Thuan nuclear power project is located in Ninh Thuan Province in central Vietnam, with plans to build four nuclear power units. In the early arrangements of the project, Russia planned to bid for the Ninh Thuan 1 Nuclear Power Project, while Japan planned to bid for the Ninh Thuan 2 Nuclear Power Project. After Japan withdrew and relinquished its preferential bidding rights, South Korea gained the opportunity to enter the competition for the project.
2026-08-01
Vietnam's Ninh Thuan Nuclear Power Plant Phases 1 and 2 Accelerate: Resettlement and Land Clearance Take Priority
On July 31, 2026, the Vietnam News Agency reported that the People's Committee of Khanh Hoa Province is urgently implementing tasks assigned by the central government to advance Sub-projects No. 1 and No. 2 of the Ninh Thuan 1 Nuclear Power Plant (Phuoc Dinh Commune) and the Ninh Thuan 2 Nuclear Power Plant (Vinh Hai Commune) — namely, resettlement and land clearance works. The Khanh Hoa Provincial Investment and Construction Project Management Board has been designated by the Provincial People's Committee as the investor for the two sub-projects. Regarding Sub-project No. 1 (resettlement and land clearance) of the Ninh Thuan 1 Nuclear Power Plant, the Provincial Project Management Board has completed the approval of construction drawings and budgets and is currently selecting contractors for 6 construction and installation packages. Among them, Package No. 15 (technical infrastructure for the resettlement area) has completed contractor selection and signed the construction contract. The construction unit has received 34.7 hectares of land and coordinate markers out of the 65.12-hectare resettlement area, and the temporary camp and project headquarters have commenced construction. The remaining packages pending bidding include: Package No. 14 (water supply facilities for the resettlement area), Package No. 16 (social infrastructure for the resettlement area), Package No. 17 (fishing vessel berthing area and revetment embankment), Package No. 18 (cemetery facilities), and Package No. 33 (construction and renovation of medium-voltage power lines and substations).
2026-07-31
Vietnam and Russia Join Forces to Accelerate Nuclear Science and Technology Research Center Project
On the afternoon of July 30, Vietnamese Minister of Science and Technology Vu Hai Quan received a delegation led by Ilja Vergizajev, General Director of Rosatom Construction Technology Co., Ltd., a subsidiary of Russia's State Atomic Energy Corporation (Rosatom), in Hanoi. During the meeting, the Vietnamese side put forward three specific requests: accelerating the construction of the Vietnam Nuclear Science and Technology Research Center (CNST); supporting Vietnam in gradually mastering small modular reactor (SMR) technologies; and training human resources for Vietnam in the fields of atomic energy, radiation, and nuclear safety. Both sides confirmed that nuclear cooperation holds strategic significance and has long been a focus of high-level attention between the two countries. The CNST has been defined by the Vietnamese side as a...
2026-07-31