Construction of the conventional island raft foundation slab for Unit 2 of Zhejiang Jinqimen Nuclear Power Plant completed

Construction of the conventional island raft foundation slab for Unit 2 of Zhejiang Jinqimen Nuclear Power Plant completed

At 3:36 on August 20, the raft foundation slab pouring for the conventional island of Unit 2 at Zhejiang Jinqimen Nuclear Power Plant was successfully completed. With the final batch of concrete precisely placed into the formwork, the main structure construction of the conventional island for this unit was officially initiated. The concrete supply for this pouring operation was provided by CNNC Concrete Xiangshan Branch. The operation lasted 29 hours and 20 minutes, with a cumulative supply of over 4,000 cubic meters of concrete, achieving continuous and stable material delivery. The maximum pouring thickness at this section was 3 meters, with a height difference of 7 meters at the variable cross-section locations, and the structural design service life is 60 years. The project features large-volume, high-intensity construction characteristics, compounded by the rainy climate conditions on site, imposing stringent requirements on concrete supply continuity, delivery stability, and temperature control precision.

2026-08-21

SuperMag New Energy Achieves Milestone Progress in Development of 25 T-Class High-Temperature Superconducting Toroidal Field Model Magnet

SuperMag New Energy Achieves Milestone Progress in Development of 25 T-Class High-Temperature Superconducting Toroidal Field Model Magnet

Recently, SuperMag New Energy has achieved two milestone progresses in the development of its 25 T-class high-temperature superconducting toroidal field model magnet: following the completion of R&D and testing of the first panel-type high-temperature superconducting single pancake coil, the company has initiated batch manufacturing of panel-type single pancake coils; meanwhile, the self-developed 24 cm² low-resistance detachable joint has completed prototype fabrication and performance testing in the liquid nitrogen temperature range, with an equivalent joint resistance of approximately 33 nΩ. These two progresses correspond to two critical aspects: stable manufacturing of single pancake coils and low-loss interconnection of multiple units. The project has advanced from the single-component process validation stage toward multi-pancake manufacturing and model magnet system integration. The single pancake coil is not an ordinary component in the model magnet, but rather a fundamental unit integrating conductor, panel structure, insulation, electrical connection, and testing interfaces. Each single pancake requires independent manufacturing and inspection, and also serves as the foundation for subsequent multi-pancake stacking, magnet excitation, and cryogenic operation.

2026-08-21

CNNC Xiyi Waste Barrel Storage Well Grinding Robot Completes On-Site Testing

CNNC Xiyi Waste Barrel Storage Well Grinding Robot Completes On-Site Testing

Recently, the waste barrel storage well grinding robot developed by CNNC Xiyi officially completed on-site testing in the grinding project of the process BOP (three wastes) storage wells of Units 3 and 4 at Xudabao, marking a substantial breakthrough in the field of automated construction in confined deep-well spaces within the nuclear industry. Waste barrel storage wells feature great depth, small openings, high verticality requirements, and high dust concentrations. Traditional manual grinding requires multiple workers to take turns entering the confined space, resulting in long construction cycles and high risks. The grinding robot developed by CNNC Xiyi is equipped with an XYZ three-axis movement mechanism and a multi-degree-of-freedom motion system with R rotation and W width adjustment, covering a working width of 12 meters with a maximum grinding depth of 5 meters, applicable to the construction of standard waste barrel storage wells across various reactor types...

2026-08-20

Full-Scope Simulator for Units 1 & 2 of Xudabao Nuclear Power Plant Officially Put into Operation

Full-Scope Simulator for Units 1 & 2 of Xudabao Nuclear Power Plant Officially Put into Operation

On August 19, the commissioning ceremony for the full-scope simulator of Units 1 & 2 of Xudabao Nuclear Power Plant was held in the simulator main control room. Chen Jin, Secretary of the Party Committee and Chairman of Liaoning Nuclear Power, and Zhang Xiong, General Manager and Deputy Secretary of the Party Committee, attended the ceremony. Gao Shunlong, Secretary of the Party Committee and Chairman of CNNC Wuhan, was invited to attend. The ceremony was presided over by Li Zhusan, Deputy General Manager of Liaoning Nuclear Power. At the ceremony site, attendees jointly watched a video reviewing the simulator construction process, and leaders from both sides jointly unveiled the plaque for the "CAP Simulator Training Center." Gao Shunlong stated that the commissioning of the simulator is an important milestone in project construction and also a brand-new starting point. CNNC Wuhan will make every effort to ensure simulator operation and maintenance support as well as optimization and upgrades, and will take this opportunity to expand the breadth and depth of cooperation with Liaoning Nuclear Power, jointly promoting high-quality project construction.

2026-08-20

Summer Technical Symposium on High-Temperature Superconducting High-Field Magnets Successfully Held in Shanghai

Summer Technical Symposium on High-Temperature Superconducting High-Field Magnets Successfully Held in Shanghai

On August 19, the Summer Technical Symposium on High-Temperature Superconducting High-Field Magnets was successfully held at the China Fusion Shanghai Headquarters. Yu Xuefeng, Deputy Secretary of the Party Committee and Deputy General Manager of China Fusion, and Xue Lei, Deputy Director of the Fusion Engineering Design Institute, attended the meeting. Xue Lei delivered an address on behalf of the Fusion Engineering Design Institute, extending a warm welcome to the experts present for their guidance. The symposium was moderated by Hu Xinbo, Director of the High-Temperature Superconducting Magnet R&D Department of the Fusion Engineering Design Institute. The symposium invited research institutions including the Technical Institute of Physics and Chemistry of the Chinese Academy of Sciences, Shanghai Advanced Research Institute of the Chinese Academy of Sciences, High Magnetic Field Science Center of the Hefei Institutes of Physical Science of the Chinese Academy of Sciences, Zhongshan Advanced Cryogenic Technology Research Institute, and Southwestern Institute of Physics of the Nuclear Industry, as well as universities...

2026-08-20

First Concrete Pour Launched for Conventional Island of Jinqimen Nuclear Power Unit 2

First Concrete Pour Launched for Conventional Island of Jinqimen Nuclear Power Unit 2

At 22:16 on August 18, Zhejiang Jinqimen Nuclear Power construction reached another key milestone as the first concrete pour (FCD) for the raft foundation slab of the turbine generator building in the conventional island of Unit 2 was officially launched, marking the full commencement of the main construction of the conventional island of Jinqimen Nuclear Power Unit 2 and the project's official entry into the civil construction phase. The raft foundation slab being poured, as the core load-bearing structure of the conventional island, is a variable-cross-section, super-large-volume, waterproof and impermeable special concrete structure, and is the core section with the largest volume, most critical working conditions, and highest precision requirements among the conventional island raft foundation structures. This construction involves long continuous operation hours, stringent temperature control and crack prevention requirements, and significant construction organization challenges. To ensure the safe and high-quality completion of the project, CNNC Zheneng fully demonstrated the "owner" spirit, played the "backbone" role, and shouldered the "main force" responsibility, jointly establishing a dedicated technical task force with construction and supervision units, building on the mature FCD construction experience of Conventional Island Unit 1 to comprehensively optimize the raft construction process for Conventional Island Unit 2, strictly adhering to the highest quality standards and safety regulations for nuclear power construction.

2026-08-20

First PCS Heat Exchanger Pre-Introduction Successfully Completed at Zhejiang Jinqimen Nuclear Power Project

First PCS Heat Exchanger Pre-Introduction Successfully Completed at Zhejiang Jinqimen Nuclear Power Project

On August 16, the pre-introduction of the first PCS heat exchanger at the Zhejiang Jinqimen Nuclear Power Project, undertaken by China Nuclear Industry Fifth Construction Co., Ltd. (CNFC), was successfully completed. The entire introduction process was smooth and orderly, with safety and quality fully under control. The smooth pre-introduction of this PCS heat exchanger has laid a solid foundation for the subsequent modular dome lifting and overall project construction. As a core key equipment in the reactor building, the PCS heat exchanger features heavy weight, high installation precision, and significant difficulty. To ensure lifting safety, the project team organized 7 special discussions and 5 on-site surveys, sorted out preconditions, fabricated dedicated angle tooling, and clarified operation procedures and safety control points. During the lifting, management personnel provided full-time on-site supervision, with commanders and operators working in close coordination to strictly control equipment positioning. After 3 hours of continuous operation, a series of processes including equipment lifting, flipping to vertical, fine angle adjustment, and equipment pre-introduction were precisely completed, and the equipment was finally placed smoothly, marking the successful completion of the pre-introduction work.

2026-08-19

China Huaneng and CGN Hold Working Talks in Shenzhen to Deepen Cooperation in Nuclear Power and Other Fields

China Huaneng and CGN Hold Working Talks in Shenzhen to Deepen Cooperation in Nuclear Power and Other Fields

On August 18, Wen Shugang, Chairman and Party Secretary of China Huaneng Group Co., Ltd., and Zhong Guodong, President and Deputy Party Secretary, held working talks in Shenzhen with Yang Changli, Party Secretary and Chairman of China General Nuclear Power Group (CGN), and Pang Songtao, Deputy Party Secretary and President. Dong Changqing, Vice President and Member of the Party Leadership Group of the Group, and Cai Zhen, Member of the Standing Committee of the Party Committee and Vice President of CGN, attended the talks. Wen Shugang expressed gratitude to CGN for its long-term support to China Huaneng and briefed on the company's operations and development. He stated that China Huaneng is currently thoroughly implementing the important speech delivered by General Secretary Xi Jinping during his inspection of China Huaneng's headquarters, ensuring that all work arrangements are carried out to the letter. Looking toward the "15th Five-Year Plan" period, China Huaneng is fully, accurately, and comprehensively implementing the new development philosophy, accelerating the construction of the "three pillars" of new energy, hydropower, and nuclear power, and promoting high-quality development to new heights. He expressed the hope that China Huaneng and CGN, building on their past sound cooperation, will continue to leverage their respective strengths, strengthen exchanges and deepen cooperation in areas such as nuclear power, new energy, and technological innovation, jointly making greater contributions to accelerating the construction of a new energy system and building a strong energy nation.

2026-08-19

Prefabricated Module for Evaporator Compartment of Loop 3 in Internal Structure of Unit 4 at Zhangzhou Nuclear Power Plant Successfully Hoisted

Prefabricated Module for Evaporator Compartment of Loop 3 in Internal Structure of Unit 4 at Zhangzhou Nuclear Power Plant Successfully Hoisted

At 10:18 on August 18, the prefabricated module for the evaporator compartment of Loop 3 in the internal structure of the reactor building of Unit 4 at Zhangzhou Nuclear Power Plant was hoisted into place, with safety and quality under control throughout the entire process. The structures above elevation 16.5 meters in the internal structure of the reactor building of Unit 4 at Zhangzhou Nuclear Power Plant, including the evaporator compartments, pressurizer compartment, and the roof slab of the passive reactor cavity injection tank, adopt a modular construction process featuring off-site prefabrication, integral hoisting, and precise positioning, divided into five concrete modules. The evaporator compartment module of Loop 3 hoisted this time is the first module to be lifted for Unit 4, weighing 454.289 tons, with an overall special L-shaped structure, lifted using a 3200-ton crawler crane. The hoisting operation lasted 3 hours, and Zhangzhou Nuclear Power...

2026-08-19

Construction of Conventional Island and BOP Installation for Units 5 & 6 of Fujian Ningde Nuclear Power Plant Launched

Construction of Conventional Island and BOP Installation for Units 5 & 6 of Fujian Ningde Nuclear Power Plant Launched

On the morning of August 18, the conventional island and BOP installation works for Units 5 & 6 of CGN Fujian Ningde Nuclear Power Plant were officially launched, marking the transition of the conventional island and BOP works of the Ningde Phase II project from the civil construction stage to the installation stage. This laid a solid foundation for the orderly advancement of key project tasks, including the main-line construction of the turbine generator units and the scaling-up of piping works for major process systems. As the core works for energy conversion and plant-wide utility support, the conventional island and BOP systems directly determine the construction quality, operational stability, and commissioning timelines of the units. They serve as critical support for ensuring safe and stable power generation and fulfilling the role of clean energy supply, and are of great significance to the high-quality completion and commissioning of the Phase II project...

2026-08-19

The Second Working Meeting of 2026 of the Special Review and Supervision Task Force for the Hainan Changjiang Small Modular Reactor Demonstration Project Convened

The Second Working Meeting of 2026 of the Special Review and Supervision Task Force for the Hainan Changjiang Small Modular Reactor Demonstration Project Convened

To further strengthen the regulatory oversight of the Hainan Changjiang Multi-purpose Modular Small Modular Reactor Science and Technology Demonstration Project (hereinafter referred to as the Small Modular Reactor Demonstration Project), the Nuclear Power Safety Regulatory Department of the Ministry of Ecology and Environment recently organized and convened the Second Working Meeting of 2026 of the Special Review and Supervision Task Force for the Small Modular Reactor Demonstration Project. Representatives from the South China Regional Office of Nuclear and Radiation Safety Supervision, the Nuclear and Radiation Safety Center, the China Machinery Productivity Promotion Center, the operating organization, and the design organization attended the meeting. The meeting focused on dialogue and exchanges regarding unresolved review issues of the Small Modular Reactor Demonstration Project, and reviewed the implementation status of action items from the first task force meeting, the overall project review status, on-site supervision status...

2026-08-18

Fuel Loading Completed for Tianwan Nuclear Power Plant Unit 7, Entering Commissioning Phase with Nuclear Fuel

Fuel Loading Completed for Tianwan Nuclear Power Plant Unit 7, Entering Commissioning Phase with Nuclear Fuel

On August 18, with the completion of core loading correctness verification and the commencement of protective tube assembly reinstallation, the first nuclear fuel loading work for Unit 7 of the Tianwan Nuclear Power Plant in Lianyungang, Jiangsu Province, was successfully concluded, marking the entry into the commissioning phase with nuclear fuel. This laid a solid foundation for subsequent reactor criticality, grid connection, and commercial operation of the unit. Fuel loading is a key milestone in the entire lifecycle of nuclear power plant construction and a critical starting point for the unit's operation with nuclear fuel. Unit 7 of the Tianwan Nuclear Power Plant is the first VVER-1200 Generation III nuclear power unit to be constructed in China, and this fuel loading also marks the first-ever fuel loading for a VVER-1200 type nuclear power unit in China. The loading process commenced on the 12th and was fully completed by the 18th, with a total of 163 nuclear fuel assemblies loaded.

2026-08-18

China and Singapore Sign Memorandum of Understanding on Cooperation in Peaceful Uses of Nuclear Technology

China and Singapore Sign Memorandum of Understanding on Cooperation in Peaceful Uses of Nuclear Technology

Singapore's Ministry of Trade and Industry and the China Atomic Energy Authority recently signed a Memorandum of Understanding on cooperation in the peaceful uses of nuclear technology, with cooperation priorities including capacity building for assessing potential nuclear energy deployment, safety assessment of nuclear reactor technology, personnel training, and nuclear technology applications. The signing ceremony was held on August 17. Singapore's Permanent Secretary for Energy and Trade at the Ministry of Trade and Industry, Augustin Lee, and Liu Jing, Deputy Director of the China Atomic Energy Authority, signed the document on behalf of their respective sides. Singapore's Minister for Trade and Industry (Energy and Industry), Tan See Leng, and Shan Zhongde, Director of the China Atomic Energy Authority, witnessed the signing...

2026-08-18

Single-Channel Pulse Source of Electromagnetic-Driven Fusion Large Scientific Facility Passes Acceptance

Single-Channel Pulse Source of Electromagnetic-Driven Fusion Large Scientific Facility Passes Acceptance

On August 16, the test and acceptance meeting for the single-channel pulse source of the comprehensive assessment experimental system of the electromagnetic-driven fusion large scientific facility, along with the inauguration ceremony of the Institute of Nuclear Fusion Science and Technology at Xi'an Jiaotong University, was held at the China Western Science and Technology Innovation Harbor. During the meeting, the single-channel pulse source of the comprehensive assessment experimental system passed testing and acceptance, and the Institute of Nuclear Fusion Science and Technology at Xi'an Jiaotong University was officially inaugurated. Before the meeting, attending experts and guests inspected the single-channel pulse source experimental system. During the acceptance session, the project team presented the overall status of the electromagnetic-driven fusion large scientific facility, the development progress of the single-channel pulse source, and the test verification results. The expert panel discussed the...

2026-08-18

CFHI and Shanghai Electric Hold Talks to Advance Cooperation in Nuclear Power Equipment and Other Fields

CFHI and Shanghai Electric Hold Talks to Advance Cooperation in Nuclear Power Equipment and Other Fields

On August 17, Lu Zhiqiang, Secretary of the Party Committee and Chairman of China First Heavy Industries (CFHI), met with Wu Lei, Secretary of the Party Committee and Chairman of Shanghai Electric Group, and his delegation at CFHI. The two sides held discussions on further deepening strategic cooperation, focusing on exchanging views on cooperation in fields such as metallurgical equipment, high-end materials, nuclear power equipment, new energy wind power, scientific research and development, and industrial chain synergy. Lu Zhiqiang welcomed Wu Lei and his delegation and expressed gratitude to Shanghai Electric for its long-standing support to CFHI. He stated that CFHI will continue to focus on its primary responsibility of equipment manufacturing, coordinate the transformation and upgrading of traditional industries, and thoroughly implement the "1235" development strategy. He expressed hope that both sides...

2026-08-18

Module 4 of Steel Liner for Unit 3 of San'ao Nuclear Power Plant Successfully Hoisted

Module 4 of Steel Liner for Unit 3 of San'ao Nuclear Power Plant Successfully Hoisted

At 8:16 a.m. on August 15, the hoisting operation of Module 4 of the 3BRX steel liner for Unit 3 of the San'ao Nuclear Power Plant was officially launched. Under the stable operation of the 2,000-ton crawler crane of CNNC Machinery Engineering, the module successively completed a series of procedures including slewing, load-bearing travel, and alignment adjustment. After 220 minutes, the hoisting task was successfully completed. Module 4 of Unit 3 hoisted this time was integrally assembled from the fourth and fifth layers of the cylinder, with a diameter of approximately 45 meters and a height of 11.46 meters. The module features a large volume, susceptibility to deformation, and limited slewing space for the crane. The project team strictly implemented the special plan, completed site reinforcement, transport of baskets and counterweights, and crawler crane relocation in advance, organized hoisting simulation drills, and comprehensively inspected various safety hazards...

2026-08-18

Concrete pouring completed for turbine deck of conventional island of Unit 2 at CGN Lufeng Nuclear Power Plant

Concrete pouring completed for turbine deck of conventional island of Unit 2 at CGN Lufeng Nuclear Power Plant

At 12:30 on August 11, 2026, concrete pouring officially commenced for the turbine deck of the conventional island of Unit 2 at CGN Lufeng Nuclear Power Plant, and was successfully completed at 16:00 on August 13, after 51.5 hours, with a total of 2,685m³ of concrete poured. The turbine deck structure of the conventional island of Unit 2 measures 68.7m in length and 16m in width, with a top elevation of +8.43m, consisting of two longitudinal beams and six transverse beams. Owner-supplied items include 296 anchor bolts, 56 lifting columns, 28 anchor plates, and 18 oil pipe sleeves, among which 8 sets of large embedded parts weigh over 10t each. The turbine deck construction features complex structures, a large number of owner-supplied embedded parts, and high precision requirements. During the turbine deck construction, the project team fully drew on the experience feedback from the conventional island turbine deck of Unit 1...

2026-08-18

SPIC Shandong Nuclear Power's Total Intellectual Property Achievements Surpass 1,000

SPIC Shandong Nuclear Power's Total Intellectual Property Achievements Surpass 1,000

Recently, the total intellectual property achievements of SPIC Group Shandong Nuclear Power surpassed 1,000, and the company was also recognized as a "Yantai Intellectual Property Advantage Enterprise." It is reported that these 1,000 achievements include over 800 patents (including 5 international patents), 194 software copyrights and work copyrights, and 3 registered trademarks. Focusing on the new scenario of nuclear energy heating, Shandong Nuclear Power has formed over 100 patent achievements covering key areas such as system design, equipment optimization, and operation control, promoting clean nuclear energy's transition from power generation to heating, and creating China's first nuclear energy comprehensive utilization brand, "Nuanhe No.1." Focusing on the technical breakthrough of reheat control valves in the conventional island under the large-scale heating scenario of AP/CAP1000 pressurized water reactor nuclear power plants, the company has overcome key technical challenges and formed a series of patent achievements, supporting the innovative development of nuclear power equipment. The main pump frequency converter is known as the "heart" of nuclear power operation. Around its technical breakthroughs, the company has established a patent portfolio, driving control optimization and equipment reliability improvement, providing strong support for innovation in nuclear power equipment.

2026-08-17

Minister of Ecology and Environment Huang Runqiu Visits Zhejiang to Survey Ecological Environmental Protection and Nuclear Power Safety Regulation

Minister of Ecology and Environment Huang Runqiu Visits Zhejiang to Survey Ecological Environmental Protection and Nuclear Power Safety Regulation

From August 14 to 15, Minister of Ecology and Environment Huang Runqiu visited Lishui, Taizhou, and Ningbo in Zhejiang Province to survey ecological environmental protection efforts. During his tenure in Zhejiang, General Secretary Xi Jinping visited Lishui multiple times and expressed high expectations for strengthening ecological environmental protection. Huang Runqiu visited Liandu District in Lishui to inspect on-site the outcomes of Oujiang River ecological environment governance, rural living environment improvement, and ecological protection efforts, and also toured the Ecological Product Value Realization Mechanism (Lishui) Exhibition Hall to gain in-depth understanding of local practical experience in advancing ecological product value accounting and exploring the "Two Mountains" transformation pathway. He stated that it is essential to thoroughly study and implement Xi Jinping Thought on Ecological Civilization, firmly establish and practice the concept that lucid waters and lush mountains are invaluable assets, adhere to ecological priority and green development, and effectively protect this beautiful landscape. It is necessary to fully leverage the role of demonstration models, deepen the application of the "Thousand Villages Demonstration, Ten Thousand Villages Improvement" experience, continuously improve the rural living environment, develop distinctive industries such as "ecology + cultural tourism" tailored to local conditions, and support rural ecological revitalization. It is also important to summarize and promote the "Two Mountains" transformation model, actively expand channels for realizing ecological product value, and continuously convert ecological advantages into development advantages. Actively, safely, and in an orderly manner developing nuclear power is an important measure for building a clean, low-carbon, safe, and efficient energy system and for achieving carbon peak and carbon neutrality. Huang Runqiu visited the Sanmen Nuclear Power Plant in Taizhou, going deep into the main control room of the operating unit and the nuclear island building of the unit under construction to learn in detail about the operation status and construction progress of the nuclear power units, and to express condolences to and meet with the on-site supervision personnel of the East China Regional Office of Nuclear and Radiation Safety Supervision. He emphasized the need to uphold the rational, coordinated, and balanced nuclear safety philosophy, place the assurance of nuclear safety at the highest priority, strengthen whole-process supervision of nuclear power plants, and consolidate the primary responsibility for nuclear safety. It is necessary to urge enterprises to strictly implement the requirements of nuclear safety regulations and standards, effectively ensure the safe operation of nuclear power units and controlled construction quality, enhance equipment stability and reliability, strengthen radiation environment monitoring at nuclear power plants, and safeguard the high-quality development of the nuclear power industry with high-level safety. Ensuring the construction quality of nuclear power units is crucial to improving the safety level of nuclear power plants. Huang Runqiu visited the nuclear island foundation area of the Jinqimen Nuclear Power Plant in Ningbo to survey the construction progress and engaged in on-site exchanges with nuclear safety supervision personnel. He emphasized the need to implement the spirit of General Secretary Xi Jinping's important speeches and instructions on nuclear safety work, always adhere to the principles of safety first and quality first, effectively operate the nuclear safety responsibility system and quality management system, and continuously strengthen experience feedback and safety improvements. It is necessary to continuously advance the development of nuclear safety culture, strengthen bottom-line thinking and extreme-scenario thinking, enhance natural disaster monitoring, early warning, and preventive response, and effectively build premium and safe projects to strongly support the sustainable development of China's nuclear power industry and its "going global" strategy. Relevant officials from Zhejiang Province participated in the survey. Principal officials from relevant departments and bureaus of the Ministry of Ecology and Environment participated in the survey. Officials from the Department of Ecology and Environment of Zhejiang Province and others participated in the survey.

2026-08-17

Steel Containment Vessel Ring 1 of Unit 1 at Guangxi Bailong Nuclear Power Plant Successfully Hoisted into Place

Steel Containment Vessel Ring 1 of Unit 1 at Guangxi Bailong Nuclear Power Plant Successfully Hoisted into Place

At 11:38 on August 16, after 4 hours and 01 minutes of continuous and stable operation, the steel containment vessel ring 1 (CV1R) of the nuclear island of Unit 1 at Guangxi Bailong Nuclear Power Plant was successfully hoisted into place. This hoisting marks another successful installation of a key module following the CVBH and CA20 modules for Unit 1 of Bailong Nuclear Power Plant, signifying a critical breakthrough in the construction of the main structure of the nuclear island of Unit 1. The steel containment vessel consists of five major modules: the bottom head, the intermediate cylindrical shell (rings 1 to 3), and the top head, serving as the third physical safety barrier of the reactor. The CV1R hoisted this time is the core component with the largest volume and heaviest weight among the five major components of the steel containment vessel, measuring approximately 15.5 meters in height and up to 39.6 meters in maximum inner diameter, integrating equipment...

2026-08-17

Successful Hoisting of Module 3 of the Passive Containment Cooling Water Tank for Unit 4 of Zhangzhou Nuclear Power Plant

Successful Hoisting of Module 3 of the Passive Containment Cooling Water Tank for Unit 4 of Zhangzhou Nuclear Power Plant

On August 15, the hoisting of Module 3 of the passive containment cooling water tank in the reactor building of the nuclear island of Unit 4 at Zhangzhou Nuclear Power Plant was successfully completed, with the entire hoisting process being safe and quality-controlled. The passive containment cooling water tank is an important component of the passive part of the containment cooling water injection system. With a total height of 22.02 meters, it features a non-uniform cross-section in an approximately fan-shaped structure and is planned as three integral modules. Module 3, hoisted this time, had a total lifting weight of approximately 132.8 tons and a height of 5.84 meters, and was positioned using a 2000-ton-class crawler crane. As the crane slowly lifted the module, through a series of precise operations including hook lifting, boom slewing, crane traveling, and luffing, Module 3 was smoothly placed onto Module 2 of the passive containment cooling water tank, with the entire process proceeding seamlessly...

2026-08-17

Reading Ranking