Search Results
Keyword:El
Saskatchewan, Canada Releases Long-Term Nuclear Energy Strategy: Plans to Build 2,600 MW of Nuclear Power by 2050
Scott Moe, Premier of Saskatchewan, Canada, officially announced the province's long-term nuclear energy development plan in Saskatoon on September 29, establishing a strategic goal of building at least 2,600 megawatts (MW) of nuclear power capacity by 2050. Moe emphasized that nuclear energy is not only a zero-carbon clean baseload power source, but also a "nation-building opportunity" that empowers economic growth for generations, will create high-end jobs across the province, attract multinational capital, and ensure long-term electricity stability for households and industry. According to the plan, four core pillars have been established: 1. Build a highly resilient power foundation supporting long-term economic growth: Rely on non-intermittent zero-carbon nuclear energy to address the electricity load gap brought about by society-wide electrification...
2026-09-30
Brookfield Renewable Discloses Strategy for Nuclear Energy Business Segment
At the Brookfield Affiliates Investor Day 2026 held on September 29, Brookfield Renewable Partners (BEP) highlighted the strategic progress and industrial layout of its nuclear energy business segment. Brookfield management noted that as AI data centers, manufacturing reshoring, and deep electrification across society drive a sharp increase in global electricity demand, power supply has become a key bottleneck constraining economic growth. Nuclear energy, with its high reliability, round-the-clock baseload attributes, and value for national energy security, is entering an unprecedented super expansion cycle not seen in decades. The...
2026-09-30
Russia is conducting high-level technical consultations with Iran on the construction of brand-new nuclear power plants
According to a comprehensive report by Azerbaijan News Network (AzerNews) and several mainstream Iranian media outlets, Alexey Likhachev, Director General of Rosatom, recently disclosed to the media in Yerevan, Armenia that Russia is conducting high-level technical consultations with Iran on the construction of brand-new nuclear power plants, with the cooperation planning scope covering both large commercial reactor types and small modular reactors (SMRs). At the same time, Rosatom's engineering team is conducting comprehensive geological and engineering assessments of multiple candidate new sites in Iran that have the conditions for nuclear power grid connection. Likhachev specifically pointed out that the strategic binding between Moscow and Tehran in the field of civilian nuclear energy...
2026-09-30
Standard Technical Specifications for Passive Nuclear Power Plants, Chiefly Compiled Under the Leadership of Shanghai Nuclear Engineering Research and Design Institute, Officially Released
Recently, the National Nuclear Safety Administration officially released the Standard Technical Specifications for Passive Nuclear Power Plants and its explanatory document, chiefly compiled under the leadership of Shanghai Nuclear Engineering Research and Design Institute, aiming to promote the standardization and normalization of technical specifications for passive nuclear power plants, continuously improve the nuclear safety supervision and management system, and further enhance the operational safety level of China's nuclear power plants. Based on the framework and format, screening criteria, and other foundations for technical specifications established by the Special Working Group on Technical Specification Optimization of the National Nuclear Safety Administration, Shanghai Nuclear Engineering Research and Design Institute, targeting the passive design characteristics of AP and CAP series nuclear power plants and fully incorporating the operating experience and safety regulatory practices of China's passive nuclear power plants, completed the compilation of China's first standard technical specifications and explanatory document for passive nuclear power plants...
2026-09-30
Qinshan Nuclear Power Plant Unit 2 of Qinshan Phase II Completes 218 Refueling Outage
At 18:30 on September 29, Unit 2 of Qinshan Phase II was successfully connected to the grid, marking the official completion of the 218 refueling outage. During this outage, more than 5,300 tasks were completed, mainly including the PSR weakness modification for prevention of boron misdilution, addition of automatic primary coolant makeup and residual heat removal eddy current detection functions, excitation system modification for the B-train emergency diesel generator, disassembly and inspection of the turbine-generator, annual inspection of the main transformer and station service transformer, replacement of No. 2 and No. 3 seals of the No. 2 main coolant pump, disassembly and inspection of the No. 1 charging pump, modification of the nuclear island switchboards, condenser cleaning and eddy current inspection, and optimization of the pipe supports where the safety injection system safety valves are located. These important tasks have laid a solid foundation for the safe and stable operation of the unit in the next fuel cycle. All outage personnel, under the...
2026-09-29
Shanghai Electric Delivers the First Domestic Steam Generator Water Chamber Head Forging for the "Guohe One"
On September 28, the first domestic water chamber head forging for the Guohe One steam generator, manufactured by Shanghai Electric, completed acceptance and was officially shipped at Shanghai Electric Shangzhong Casting and Forging Co., Ltd. The water chamber head is a key pressure-bearing core component of the Guohe One steam generator, with a single-piece net weight of 90 tons. It features a complex structure with ultra-large dimensions, ultra-thick cross-sections, and irregular multi-nozzle geometry, making it the world's largest nuclear power irregular complex-structure large forging, with manufacturing difficulty far exceeding that of similar products for existing domestic nuclear power reactor types. Facing this world-class extreme manufacturing challenge, Shanghai Electric concentrated its efforts to successively break through 500-ton-class ultra-pure low-segregation large steel ingot manufacturing, integrated forging forming technology for multi-nozzle spherical heads,...
2026-09-29
Unit 7 reactor at China's Tianwan Nuclear Power Plant reaches Minimum Controlled Power Level
According to reports, the reactor of Unit 7 at the Tianwan Nuclear Power Plant, built through China-Russia cooperation and using a Russian design, has reached the Minimum Controlled Power Level (MCP). This marks the first time the reactor has entered a self-sustaining controlled chain nuclear reaction state in the core. All technical operations were carried out in accordance with design requirements and the startup plan, under the joint supervision of experts from Russian and Chinese operating, design, and regulatory organizations. Alexey Likhachev, Director General of Rosatom, stated that the Tianwan Nuclear Power Plant is a model project of Russia-China cooperation. Units 1 and 2, built according to the Russian scheme...
2026-09-29
Pakistan Denies Overflight Permission, Bangladesh's Rooppur Nuclear Power Plant Fuel Transport Blocked
Recently, the nuclear fuel transport for Unit 2 of Bangladesh's Rooppur Nuclear Power Plant (RNPP) was delayed because Pakistan did not approve overflight permission. Faqir Mahbub Anam, Minister of the Ministry of Science and Technology of Bangladesh, stated that the chartered flight was originally scheduled to arrive at Hazrat Shahjalal International Airport in Dhaka on September 24, but could not proceed because it was not granted permission to enter Pakistani airspace. It is reported that the route usually passes through Kazakhstan, Turkmenis...
2026-09-29
General Matter Submits HALEU License Application to U.S. NRC
Paducah, Kentucky, USA — General Matter submitted a license application to the U.S. Nuclear Regulatory Commission (NRC) on September 28, 2026, for the construction and operation of a nuclear facility. The project aims to produce High-Assay Low-Enriched Uranium (HALEU) to meet the growing domestic demand for advanced nuclear reactor fuel in the United States. General Matter plans to build a dedicated HALEU production...
2026-09-29
SPIC Releases Its First Fully Independent Full-Scope Simulator and Related Independent Technologies in Beijing
On September 28, SPIC released its first fully independent full-scope simulator and related independent technologies in Beijing, announcing that State Power Investment Corporation (SPIC) has mastered complete full-scope simulator R&D and supply capabilities. A full-scope simulator is like a mirror of a nuclear power plant; operators performing control actions in the full-scope simulator receive realistic feedback in real time. With the help of this "digital nuclear power plant without nuclear accident hazards," operators repeatedly hone their daily operational control and accident handling skills, becoming professionals who ensure the safe and efficient operation of real nuclear power plants. To ensure the training quality of main control room operators at nuclear power plants, the SPIC Central Research Institute took the lead, together with State Nuclear Power Automation System Engineering Company (SNPAS) and State Nuclear Power Demonstration Plant (SNPDP)...
2026-09-28
Uranium Fuel Air Delivery for Rooppur Nuclear Power Plant Unit 2 in Bangladesh Delayed
Recently, the first batch of uranium nuclear fuel transport cargo flights for Unit 2 of Bangladesh's first nuclear power facility—the Rooppur Nuclear Power Plant (RNPP)—was forced to be suspended, resulting in the postponement of the originally scheduled delivery. The batch of nuclear fuel was originally planned to arrive by air on September 24 at Hazrat Shahjalal International Airport in Dhaka, the capital of Bangladesh. Faqir Mahbub Anam, Minister of the Ministry of Science and Technology of Bangladesh, stated that the cargo charter flight carrying the uranium fuel was originally scheduled to land on the 24th, but because it was not granted permission to enter Pakistani airspace, the flight could not proceed as scheduled, and the specific reason why Pakistan has not yet approved the airspace permit remains unclear. Anam added that the Russian side has provided a new timetable, and it is expected that this batch of uranium fuel will arrive in Bangladesh in the first week of October.
2026-09-28
Fudan University Approved for China's First "Fusion Science and Engineering" Interdisciplinary First-Level Doctoral Degree Program
Recently, Fudan University's "Fusion Science and Engineering" interdisciplinary first-level doctoral degree program was officially approved, making the university the first higher education institution in China to establish such an interdisciplinary first-level doctoral degree program. The degree program is led by the Institute of Modern Physics (Department of Nuclear Science and Technology), and will officially begin doctoral student admissions in 2026. Currently, global fusion R&D is transitioning from the stage of scientific exploration to the critical period of engineering verification and commercialization. China's "15th Five-Year Plan" recommendations list fusion energy as a new economic growth point for future industries. Accelerating the cultivation of high-level fusion talent has become an urgent task for safeguarding national energy security and seizing the high ground of future science and technology industries. Fudan University...
2026-09-28
Dongfang Electric Signs Low-Pressure Diaphragm Supply Agreement with Électricité de France, Supporting the Upgrade and Retrofit of European Pressurized Water Reactor Nuclear Power Units
Recently, Dongfang Electric International Corporation (hereinafter referred to as "Dongfang International"), a subsidiary of China Dongfang Electric Group Co., Ltd., and Arabelle, a subsidiary of Électricité de France (EDF), officially signed a nuclear power steam turbine low-pressure diaphragm supply agreement. According to the agreement, Dongfang Electric will serve as a key equipment supplier, providing core steam turbine low-pressure diaphragm components for the life extension and modernization technical retrofit projects of pressurized water reactor (PWR) nuclear power units under Électricité de France. For more than three decades, Dongfang Electric Group and Électricité de France have consistently maintained close strategic collaboration in the field of civil nuclear energy, from...
2026-09-28
National Standard "Test Methods for Plasma Parameters (GB/T 48094—2026)" Led by the University of Science and Technology of China Officially Released, Solidifying the Standardization Foundation for Controlled Nuclear Fusion and High-Tech Industries
Recently, led by the University of Science and Technology of China (USTC), in collaboration with research institutions including the Aerospace Information Research Institute of the Chinese Academy of Sciences, the Hefei Institutes of Physical Science of the Chinese Academy of Sciences, the Southwestern Institute of Physics (SWIP), and the Beijing Institute of Environmental Characteristics, universities including Yunnan University, Nanchang University, China Jiliang University, and Chizhou University, as well as key industry-chain enterprises including Anhui USTC Yuke Technology Co., Ltd., Anhui Zhongke Fusion Terahertz Technology Co., Ltd., and Fermion Technology (Shanghai) Co., Ltd., jointly drafted, and the national standard "Test Methods for Plasma Parameters" (Standard No.: GB/T 48094—2026), under the centralized management of the National Technical Committee 487 on Optoelectronic Measurement of Standardization Administration of China (SAC/TC487), was officially approved for release and will be formally implemented from March 2027. This standard establishes unified specifications for test methods of key plasma physical parameters, fills the gap in national-level technical standard basis, and marks a milestone breakthrough for China in the standardization of advanced plasma diagnostic technology.
2026-09-28
World's First Compact Fusion Energy Experimental Device BEST TF Coil Cases Delivered in Batch
On September 27, the completion and shipment ceremony for the batch components of the toroidal field (TF) coil cases of the world's first compact fusion energy experimental device—the Burning Experimental Fusion Test (BEST)—was held at the Deyang, Sichuan base of China National Machinery Industry Heavy Equipment Group Co., Ltd. (Sinomach Heavy Equipment). With this, all 8 BEST TF coil case batch components undertaken and developed by Sinomach Heavy Equipment have been fully manufactured and assembled, and successfully shipped for delivery. Song Yuntao, Party Secretary and Director of the Institute of Plasma Physics, Chinese Academy of Sciences, and Han Xiaojun, Party Secretary and Chairman of Sinomach Heavy Equipment, delivered speeches at the ceremony respectively. Liu Zhihong, Deputy Secretary of the Discipline Inspection Commission of the Institute of Plasma Physics and Deputy General Manager of Fusion New Energy (Anhui) Co., Ltd...
2026-09-28