Search Results
Keyword:Nuclear
KHNP and France's Orano Expand Nuclear Fuel Supply Chain Cooperation
On September 8, Korea Hydro & Nuclear Power (KHNP) and France's Orano SA (Orano) signed a letter of intent for long-term cooperation in uranium enrichment at the Élysée Palace in Paris. The signing ceremony was witnessed by the leaders of both South Korea and France. This letter of intent represents a further extension of the existing cooperation between the two parties. In April this year, during French President Emmanuel Macron's visit to South Korea, KHNP and Orano had signed a memorandum of understanding on global, mutually beneficial cooperation in the nuclear fuel cycle sector. Under the letter of intent, the two parties plan to deepen cooperation in the front-end of the nuclear fuel cycle. KHNP...
2026-09-09
US ONE Nuclear Advances 1 GW SMR Project in Louisiana
ONE Nuclear Energy LLC (referred to as "ONE Nuclear") recently announced that its Amberjack small modular reactor (SMR) project in Louisiana, USA, has entered the technical and environmental assessment phase. The project is planned as a standalone, scalable multi-unit SMR campus targeting an advanced nuclear power generation capacity of up to approximately 1 GW. ONE Nuclear stated that the final installed capacity, reactor technology pathway, and plant configuration for the Amberjack project have not yet been determined and will depend on subsequent technology down-selection, detailed engineering design, environmental assessment, transmission studies, commercial arrangements, financing, and federal licensing processes. The company previously also announced...
2026-09-09
GE HealthCare's StarGuide GX Digital 4D CZT SPECT/CT Receives FDA 510(k) Clearance in the U.S.
GE HealthCare recently announced that its new digital 4D CZT SPECT/CT system, StarGuide GX, has received 510(k) clearance from the U.S. Food and Drug Administration (FDA). The system had previously obtained CE marking, and this U.S. clearance marks progress in the clinical adoption of its next-generation molecular imaging technology. Designed for theragnostics and precision medicine needs, StarGuide GX is a comprehensive SPECT/CT system. It supports imaging at multiple energy levels, enables general-purpose SPECT imaging, and is tailored for emerging tracer applications, including investigational α-emitters, aiming to provide imaging support for clinicians and researchers exploring new pathways in diagnosis, treatment planning, and therapeutic response monitoring.
2026-09-09
Australia's First ZAP-X Gyroscopic Radiosurgery Platform to Be Installed at St Vincent's Hospital Sydney
ZAP Surgical Systems has announced that GenesisCare will become the first cancer treatment provider in Australia to introduce the ZAP-X Gyroscopic Radiosurgery® platform. The device is expected to be installed this month at GenesisCare's center at St Vincent's Hospital in Sydney, New South Wales, with the first patients anticipated to begin treatment before the end of the year. The deployment of the ZAP-X platform will enhance GenesisCare's neuro-oncology treatment capabilities in Sydney, enabling it to deliver dedicated stereotactic radiosurgery (SRS). Previously, SRS patients were primarily treated using cobalt-60 systems and multi-purpose radiotherapy linear accelerators. The ZAP-X, in contrast, is a dedicated platform designed for non-inv...
2026-09-09
US Lightbridge Aims to Accelerate Advanced Nuclear Fuel Commercialization via INL Project
Lightbridge Corporation, a US advanced nuclear fuel technology company, announced on September 8 that it has been selected for the "Launchpad" program advanced by the US Department of Energy (DOE) at Idaho National Laboratory (INL), and plans to leverage this opportunity to accelerate the deployment of Lightbridge Fuel™ in commercial reactors. According to a shareholder letter from Lightbridge Chairman and CEO Seth Grae, the company will pursue a two-track commercialization strategy: on one track, under DOE authorization, it will build the Specialized High-Assay Low-Enriched Uranium Extrusion Demonstration (SHED) facility to produce Lead Test Assemblies (LTAs); on the other...
2026-09-09
Ukraine's Energoatom purchases additional 41 VVER Spent Fuel Dry Storage Systems
Holtec Nuclear recently announced that Ukraine's national nuclear energy company Energoatom has awarded it a new contract to supply an additional 41 spent fuel safe transport and storage systems for VVER reactors at Ukraine's Khmelnytskyi, Rivne, and South Ukraine nuclear power plants. The contract was signed on August 26, 2026. Energoatom's acting CEO Pavlo Kovtonyuk signed the contract in Kyiv, while Holtec Nuclear's CEO and Board Chairman Kris Singh signed in Camden, New Jersey, USA...
2026-09-09
Alpha-9 Oncology Initiates Phase 1 Clinical Trial of GRPR-Targeted Radiotherapy, First Patient Dosed
Alpha-9 Oncology, a U.S. clinical-stage radiopharmaceutical company, recently announced that the first patient has been dosed in its Phase 1 clinical trial evaluating two GRPR-targeted radiopharmaceuticals. The study involves the actinium-225-labeled compound 225Ac-A9-0642 and the lutetium-177-labeled compound 177Lu-A9-0631, primarily enrolling patients with breast cancer and other solid tumors, with data expected to be released by the end of 2027. According to the company, both 225Ac-A9-0642 and 177Lu-A9-0631 target the gastrin-releasing peptide receptor (GRPR). GRPR is considered a solid tumor-associated target with potential clinical value in breast cancer and other solid tumors. 225Ac-A9-0642 is Alpha-9's first actinium-225 GRPR-targeted compound to enter clinical evaluation...
2026-09-09
U.S. Department of Energy Provides $1.9 Billion Loan to Support Restart of Duane Arnold Nuclear Power Plant
NextEra Energy announced on September 8 that it has completed a loan arrangement of up to $1.9 billion with the U.S. Department of Energy (DOE) to support the restart of the Duane Arnold Energy Center in Iowa. The project will help restore operations at Iowa's only nuclear power plant and add stable electricity supply to the regional grid. Located in Linn County, Iowa, the Duane Arnold Energy Center has a generating capacity of 615 megawatts. NextEra Energy has previously stated that, subject to regulatory approvals, it plans to restart the facility no later than the first quarter of 2029. The DOE loan will support related restoration efforts, including...
2026-09-09
Hitachioomiya City Assembly in Ibaraki Prefecture, Japan, discusses literature survey request for nuclear waste disposal site
Hitachioomiya City in Ibaraki Prefecture, Japan, received a request from Japan's Ministry of Economy, Trade and Industry (METI) asking the city to accept a literature survey for the siting of a final disposal facility for high-level radioactive waste. On September 8, the Hitachioomiya City Assembly held a general question-and-answer session, during which multiple city assembly members expressed their views on whether to accept the survey. Of the five assembly members who filed questions that day, two expressed opposition to accepting the request and one expressed support. The assembly plans to hold a closed-door meeting on September 9, at which each assembly member will state their position, and the relevant content will subsequently be conveyed to Mayor Sadayuki Suzuki for his consideration in formulating the city government's response. Assembly member Toshiyuki Kurata stated that if the literature survey proceeds, it would impact the policies and projects currently being implemented by the city...
2026-09-09
South Korea's Hanbit Nuclear Power Plant Unit 2 Shut Down Upon Expiration of Design Lifespan
South Korea's Hanbit Nuclear Power Plant Unit 2 will cease operation upon the expiration of its 40-year design lifespan. Following the shutdown of this unit, two of the six units at the Hanbit plant will have been taken offline due to reaching the end of their design lifespans. Unit 2 of the Hanbit plant received its operating license on September 12, 1986, and commenced commercial operation on June 10, 1987. Based on a 40-year design lifespan, the unit's operating license remains valid until September 11, 2026. The operator plans to conduct periodic inspections and planned preventive maintenance after the unit is shut down. In accordance with relevant regulations, once a unit reaches the end of its design lifespan, it may not resume operation until its application for continued operation is approved, and it must undergo legally required inspections and maintenance, and...
2026-09-09
Yang Changli, Chairman of China General Nuclear Power Group, Meets with Lao Minister of Industry and Commerce Malaythong Kommasith and Standing Vice Chairman of the Lao-China Cooperation Committee Sengsadeth Sayasone
On September 7, Yang Changli, Chairman of China General Nuclear Power Group Co., Ltd., met separately with Lao Minister of Industry and Commerce Malaythong Kommasith and Sengsadeth Sayasone, Standing Vice Chairman of the Lao-China Cooperation Committee, at the CGN Tower in Shenzhen, conducting in-depth exchanges on deepening practical cooperation in energy, industry, agriculture, and people's livelihood. Prior to the meetings, Malaythong Kommasith and his delegation also visited and inspected the Daya Bay Nuclear Power Base. He Haibin, Chief Accountant of the Group, and Li Yilun, Vice President, attended relevant activities respectively. ▲Yang Changli meets with Lao Minister of Industry and Commerce Malaythong Kommasith ▲Yang Changli meets with Standing Vice Chairman of the Lao-China Cooperation Committee Sengsadeth Sayasone...
2026-09-09
"Junhe-1" OTSG Thermal-Hydraulic Experiment Program Passes Expert Review
On September 2, 2026, Shanghai Junhe Atomic Technology Co., Ltd. organized an expert review meeting on the "Junhe-1 OTSG Single-Tube Flow and Heat Transfer Experiment Program" and the "Junhe-1 OTSG Parallel Channel Flow Instability Experiment Program." The review meeting invited multiple experts from CGN Research Institute, Shanghai Nuclear Engineering Research and Design Institute, Fudan University, Nanjing University of Aeronautics and Astronautics, and Shanghai Jiao Tong University. The first thermal experiment project of Junhe-1 is undertaken by Professor Gu Hanyang's team from Shanghai Jiao Tong University, which has extensive experience in reactor R&D experiments and has undertaken multiple thermal-hydraulic experiment tasks for the Hualong One and domestic small reactor R&D projects. The meeting heard...
2026-09-09
Pakistan Karachi Nuclear Power Plant Unit K-3 Connected to Grid After Major Overhaul
At 03:30 local time on September 7, 2026, Unit K-3 of the Karachi Nuclear Power Plant in Pakistan was successfully connected to the grid. Since the unit was disconnected from the grid on July 1, 2026 for this major overhaul, the Chinese and Pakistani teams have worked closely together to successfully complete all maintenance tasks. This overhaul involved heavy workloads and multiple critical points. The CNNC Overseas Operation and Maintenance team planned and deployed in advance, refined the overhaul plan, coordinated and allocated various resources, clarified responsibilities, implemented dynamic tracking and daily work reviews, and efficiently completed key tasks including the modification of the lower half heat shield of the low-pressure cylinder, preventive maintenance of UPS, maintenance of the containment spray pipeline, emergency repair of the emergency compressed air compressor, and technical guidance for turbine overhaul, eliminating equipment hazards and consolidating the foundation for safe unit operation...
2026-09-09
Two South Korean companies to collaborate on expanding fusion energy projects
KEPCO Engineering & Construction (KEPCO E&C) signed a Memorandum of Understanding (MOU) with Enable Fusion on September 7 at the Daejeon Science Center to establish a cooperation framework for participation in fusion energy projects, technology sharing, and joint business development. Kim Tae-kyun, President of KEPCO E&C, and Lee Kyung-soo, CEO of Enable Fusion, attended the signing ceremony. Under the MOU, the two parties will provide each other with technical and commercial information required for participation in the construction of fusion power facilities and jointly develop fusion energy projects both domestically and overseas. KEPCO E&C plans to...
2026-09-08
BESIII Experiment Achieves High-Precision Measurement of Charm Meson Semileptonic Decays and First Constraint on "Scalar Current"
Recently, the BESIII international collaboration utilized the world's largest near-threshold charm meson data sample to perform a combined measurement of four semileptonic decay channels: D⁰→K⁻e⁺νₑ, D⁰→K⁻μ⁺νμ, D⁺→K̄⁰e⁺νₑ, and D⁺→K̄⁰μ⁺νμ. The research team extracted the quark mixing matrix element |Vcs| with a precision better than 0.5%, determined the form factor zero-point value f₊(0) with a precision better than 0.2%, and verified lepton universality in the above processes at the 0.5% precision level. Beyond these precise determinations of Standard Model parameters, what is particularly noteworthy is that this experiment has, for the first time...
2026-09-08