Search Results

Keyword:CT

South Korea Designates SMR and MMR as National Strategic Technologies; South Gyeongsang Province Says It Will Promote Transition of Nuclear Power Companies

South Korea Designates SMR and MMR as National Strategic Technologies; South Gyeongsang Province Says It Will Promote Transition of Nuclear Power Companies

South Gyeongsang Province said on August 4 that it welcomes the South Korean government's designation of Small Modular Reactors (SMR) and Micro Modular Reactors (MMR) as national strategic technologies in the 2026 tax reform plan. Under the relevant arrangement, the South Korean government will revise the Special Tax Treatment Control Act and its enforcement decree to include industries related to small modular reactors of 300 MW or less and micro modular reactors of 20 to 30 MW class within the scope of national strategic technologies. Going forward, companies conducting R&D on SMR and MMR technologies or investing in related facilities will be eligible for higher tax credits for R&D and facility investment. South Gyeongsang Province believes that this policy will provide an opportunity for local nuclear power companies to transition into the SMR...

2026-08-05

South Korea Accelerates Safety Reviews of Long-Term Operating Nuclear Reactors and Advances Licensing of First Spent Fuel Dry Storage Facility

South Korea Accelerates Safety Reviews of Long-Term Operating Nuclear Reactors and Advances Licensing of First Spent Fuel Dry Storage Facility

The Nuclear Safety and Security Commission (NSSC) of South Korea stated at its second-half work report meeting on August 4 that it will accelerate safety reviews of long-term operating nuclear reactors while simultaneously advancing regulatory efforts such as licensing systems for spent fuel dry storage facilities and small modular reactors. Under the plan, the NSSC will conduct safety inspections on nine reactors applying for continued operation, with review standards referencing newly built nuclear power plants and confirming safety margins in consideration of the characteristics of long-term unit operation. Among these, whether Kori Nuclear Power Plant Units 3 and 4 will be approved for continued operation in the second half of this year, and whether Hanbit Nuclear Power Plant Units 1 and 2 will be approved for continued operation in the first half of next year, are the near-term review priorities...

2026-08-05

Lifting Task of Large Storage Tanks in Cryogenic System Tank Area of HL-3 Upgrade Project Successfully Completed

Lifting Task of Large Storage Tanks in Cryogenic System Tank Area of HL-3 Upgrade Project Successfully Completed

On August 4, the lifting task of large storage tanks in the cryogenic system tank area of the HL-3 upgrade project, undertaken by the Southwestern Institute of Physics (SWIP), was successfully completed. After two days and one night of continuous efforts, a total of 14 large storage tanks were precisely positioned, including 6 medium-pressure high-purity helium storage tanks of 100 cubic meters each, 2 cryogenic liquid nitrogen storage tanks of 100 cubic meters each, and 6 auxiliary helium storage tanks, with a total lifting tonnage exceeding 200 tons. The achievement of this key milestone marks significant phased progress in the installation of cryogenic system equipment. Once the cryogenic system is completed, it will provide stable and reliable cooling capacity for the neutral beam injection system and the toroidal cryopumps of the HL-3 device, effectively enhancing the neutral beam injection efficiency and...

2026-08-05

WANO Peer Review Successfully Conducted for Hainan Nuclear Power Units 1 and 2

WANO Peer Review Successfully Conducted for Hainan Nuclear Power Units 1 and 2

From July 13 to 31, the World Association of Nuclear Operators (WANO) conducted a three-week operational peer review of Hainan Nuclear Power Units 1 and 2. The review involved 22 industry experts from 5 countries and regions, who carried out a comprehensive and systematic assessment of Hainan Nuclear Power across ten core areas including organizational management, operations, maintenance, and technology, through various methods such as on-site observations, personnel interviews, and document reviews. In addition, the expert team conducted a special evaluation of the plant's nuclear safety culture status and the implementation of Significant Operating Experience Reports (SOER). At the review summary meeting, the review team announced the assessment results and provided professional recommendations for the plant's continuous improvement. ...

2026-08-05

Cold Functional Test of Tianwan Nuclear Power Plant Unit 8 Successfully Completed

Cold Functional Test of Tianwan Nuclear Power Plant Unit 8 Successfully Completed

On August 3, the cold functional test (hereinafter referred to as the "cold test") of Tianwan Nuclear Power Plant Unit 8, constructed by China Nuclear Industry 23 Construction Co., Ltd. (CNI23), was successfully completed, marking the official transition of the unit from the engineering installation phase to the system commissioning and testing phase, laying a solid foundation for subsequent hot functional test, reactor fuel loading, and grid connection. The cold test is the first comprehensive commissioning test after a nuclear power unit enters the system commissioning phase and is one of the important milestone nodes in nuclear power plant engineering construction. Its main purpose is to verify the integrity and leak-tightness of the pressure boundary, including primary loop pipeline welds, equipment, and high-pressure sections of connected systems, comprehensively inspect on-site installation quality, and precisely identify potential hazards. It serves as the first comprehensive and systematic "physical examination" of the reactor before its operation.

2026-08-05

Smolensk NPP Successfully Conducts Emergency Drill Multi-Agency Coordination Tests Response Capabilities

Smolensk NPP Successfully Conducts Emergency Drill Multi-Agency Coordination Tests Response Capabilities

On August 3, the Smolensk Nuclear Power Plant successfully conducted an accident response drill, with the participation of the Nuclear Power Plant Emergency Assistance Team (OPAS) of Rosenergoatom and emergency service departments. The drill brought together nuclear power plant staff, the crisis center team of Rosatom, local fire departments, medical institutions, and government representatives from the city of Smolensk and the Yelnya district. During the drill, all parties focused on practicing key tasks such as the alert and preparation of emergency response forces under non-routine conditions, organizing protective measures for personnel and local residents, and monitoring unit status and safety levels. The drill also included simulated fire...

2026-08-04

Balakovo NPP Conducts Special Traffic Safety Inspection Jointly with State Traffic Police

Balakovo NPP Conducts Special Traffic Safety Inspection Jointly with State Traffic Police

Balakovo NPP and the traffic administration recently conducted a joint preventive inspection aimed at improving road safety in the station area and preventing traffic accidents. The operation was carried out by experts from the NPP's transport workshop together with traffic police officers from the Balakovo City Police Department, as part of the annual safety inspection campaign. During the inspection, inspectors carefully checked compliance with traffic rules by vehicle drivers and pedestrians within the NPP premises. The results showed that no violations were detected, which fully reflects the high level of discipline and responsible attitude toward safety requirements demonstrated by Balakovo NPP employees and those of its contractors. The traffic police department stated that the main objective of such inspections is...

2026-08-04

NPCIL launches engineering design tender for 220 MWe Bharat Small Reactor

NPCIL launches engineering design tender for 220 MWe Bharat Small Reactor

Nuclear Power Corporation of India Limited (NPCIL) has issued a tender notice inviting bids for plant engineering design and 3D modeling services for its 220 MWe-class Bharat Small Reactor (BSR) project. The reactor design is based on India's existing 220 MWe pressurized heavy water reactor (PHWR) technology, with a bid submission deadline of August 10. The scope of this tender covers general design and engineering services for civil, process, mechanical, piping, electrical, control and instrumentation systems, as well as heating, ventilation and air conditioning systems, pipe stress analysis, and 3D computer modeling. NPCIL aims to select a supplier capable of delivering an integrated engineering solution and providing support for subsequent detailed design verification, construction and commissioning documentation. The project requires suppliers to prioritize quality assurance and comply with relevant regulatory and technical standards.

2026-08-04

X-energy and SGL Carbon to Expand Nuclear-Grade Graphite Production Capacity

X-energy and SGL Carbon to Expand Nuclear-Grade Graphite Production Capacity

X-Energy and SGL Carbon announced on August 3 that they have signed a binding agreement to expand production capacity for NBG-18 medium-grained isotropic nuclear-grade graphite. NBG-18 is a critical specialty material for X-Energy's Xe-100 high-temperature gas-cooled reactor, supporting the company's subsequent commercial project deployments. Under the agreement, X-Energy will invest up to $8 million in phases to support the construction of new facilities and equipment upgrades at SGL Carbon's plant in Chedde, France. Upon completion of the expansion, the plant will be capable of producing graphite billets annually sufficient for up to eight Xe-100 reactors. SGL Carbon has also agreed to expand its graphite billet processing capacity in the United States to enhance the stability of this safety-critical material supply chain.

2026-08-04

CCTE Signs Supply Agreement with BWXT Canada to Advance Commercial Demonstration of ANEEL Fuel

CCTE Signs Supply Agreement with BWXT Canada to Advance Commercial Demonstration of ANEEL Fuel

U.S. nuclear fuel company Clean Core Thorium Energy (CCTE) announced on August 3 that it has signed a fuel manufacturing supply agreement with BWXT Canada Ltd. to further refine manufacturing conditions for the commercial demonstration of its ANEEL nuclear fuel platform. Under the agreement, BWXT Canada will provide qualified fuel assembly hardware for integration with ANEEL fuel pellets, and assemble them into complete, reactor-representative full-scale demonstration fuel assemblies at the Chalk River Laboratories under Canadian Nuclear Laboratories (CNL). CCTE is responsible for providing ANEEL fuel...

2026-08-04

T-Robotics to Participate in South Korea's Radioactive Waste Management Robot Demonstration Project

T-Robotics to Participate in South Korea's Radioactive Waste Management Robot Demonstration Project

T-Robotics, a South Korean industrial humanoid robot and autonomous mobile robot (AMR) company, announced on August 4 that it has signed a memorandum of understanding to advance the 2026 large-scale integrated robot demonstration project. The MOU was jointly signed by T-Robotics, the Korea Radioactive Waste Agency (KORAD), Klobot, and the Gyeongbuk ICT Convergence Industry Promotion Association. The parties plan to jointly pursue a government demonstration project targeting high-risk radioactive waste safety management scenarios, exploring the collaborative application of multiple types of robots in radioactive waste disposal facilities. Under the agreement, the participating organizations will establish...

2026-08-04

Russia Says Balkhash NPP Construction Will Boost Kazakhstan's Nuclear Energy Industry

Russia Says Balkhash NPP Construction Will Boost Kazakhstan's Nuclear Energy Industry

Russian Deputy Foreign Minister Mikhail Galuzin recently stated that the construction of Kazakhstan's first nuclear power plant, the Balkhash NPP, will help the country establish a modern nuclear energy industry. Rosatom, Russia's state atomic energy corporation, is participating in the project as the lead party. Speaking at the plenary session of the Third Russia-Kazakhstan Media Forum, Galuzin said that Russia and Kazakhstan cooperate in multiple areas, with the Balkhash NPP being one of the recent collaborative projects. He noted that the plant will be built to a Russian design and, once completed, will provide a foundation for the development of Kazakhstan's nuclear energy industry. According to current plans, the Balkhash NPP project is scheduled to begin construction in 2027...

2026-08-04

Valar Atomics Completes $1 Billion Equity Financing, Sequoia Capital Partner Joins Board

Valar Atomics Completes $1 Billion Equity Financing, Sequoia Capital Partner Joins Board

Nuclear energy startup Valar Atomics confirmed on August 3 that it has completed a $1 billion equity financing round led by Sequoia Capital. Company founder and CEO Isaiah Taylor stated that Sequoia Capital partner Shaun Maguire has joined the company's board of directors. In addition to the equity financing, Valar Atomics also secured a $200 million credit facility from Erebor and other banks. Valar Atomics did not disclose its post-financing valuation. Reports indicate the company is valued at approximately $6 billion. Valar Atomics primarily...

2026-08-04

Russian Researchers Develop High-Wear-Resistant Steel Sample for Nuclear Waste Processing

Russian Researchers Develop High-Wear-Resistant Steel Sample for Nuclear Waste Processing

Novosibirsk State Technical University (NSTU) recently announced that Russian researchers have developed a steel sample with reinforcing elements. Experimental results show that the durability of this material is approximately 4 times that of 5KhNM tool steel currently used in nuclear power plant waste processing equipment. The research focuses on improving precipitation hardening steel structures. Precipitation hardening steel is a special class of alloy material that, after quenching and holding at specific temperatures, precipitates fine, hard particles within the steel, thereby enhancing strength and wear resistance. The researchers aim to replace existing 5KhNM tool steel with new high-strength alloys...

2026-08-04

Carbon isotope analysis reveals: Canadian Arctic seabed sediments can sequester part of permafrost organic carbon

Carbon isotope analysis reveals: Canadian Arctic seabed sediments can sequester part of permafrost organic carbon

News dated August 3, 2026: Researchers from the Alfred Wegener Institute and the Center for Marine Environmental Sciences at the University of Bremen conducted a study on permafrost coasts near Herschel Island (Qikiqtaruk) in Canada, finding that not all terrestrial organic carbon released by Arctic permafrost thaw and coastal erosion enters the atmosphere—a significant portion is instead stored in seabed sediments. The findings have been published in the journal *Nature Geoscience*. Arctic terrestrial permafrost ecosystems store approximately 130 billion tons of carbon from organic sources such as plant debris, while marine and river delta sediments contain an additional 40 billion tons. As Arctic warming accelerates...

2026-08-04