Search Results

Keyword:SH_N

Sweden's Blykalla applies to build eight lead-cooled SMRs in Tierp

Sweden's Blykalla applies to build eight lead-cooled SMRs in Tierp

Swedish nuclear engineering company Blykalla submitted an application to the Swedish government on August 25 for approval to build a new nuclear power plant, planning to construct up to eight SEALER-type lead-cooled small modular reactors in the Önterå area of Tierp, Sweden. The project is proposed to be located between Uppsala and Gävle, near the Önterå and Söderfors hydropower stations. Blykalla CEO Jacob Stedman stated that the company surveyed approximately 50 to 70 potential sites across Sweden before finalizing the location, with a focus on finding areas where power could be generated locally and connected directly to the grid. According to the plan, the total installed capacity of the Tierp project is expected to reach up to...

2026-08-25

US to Partner with UK Firm to Advance Nuclear-Powered Commercial Ships

US to Partner with UK Firm to Advance Nuclear-Powered Commercial Ships

Stephen Carmel, Administrator of the U.S. Maritime Administration (MARAD), stated that the United States will sign an agreement with Core Power, a UK-based marine nuclear energy company, to jointly advance the development of a fleet of nuclear-powered commercial ships. Under the arrangement, Washington plans to sign a public-private cooperation agreement with Core Power. The company will participate in promoting the research and development of nuclear propulsion systems in the shipping sector, accelerating the exploration of applications for this technology in commercial vessels. In June of this year, the American Bureau of Shipping (ABS) approved a nuclear-powered ship design proposed by the Massachusetts Institute of Technology (MIT). The design is regarded as a significant step forward in the U.S. technological pathway for nuclear-powered commercial ships...

2026-08-25

Hitachi Receives Order for Heavy Ion Therapy System from Shanghai Proton and Heavy Ion Center

Hitachi Receives Order for Heavy Ion Therapy System from Shanghai Proton and Heavy Ion Center

Recently, Hitachi (China) Co., Ltd. received an order for one heavy ion cancer therapy system from the Shanghai Proton and Heavy Ion Center, and the two parties held a signing ceremony. This order is part of the Phase II construction project of the Shanghai Proton and Heavy Ion Center. Rendering of the completed Phase II project of the Shanghai Proton and Heavy Ion Center The Shanghai Proton and Heavy Ion Center is the first medical institution in China to possess both proton and heavy ion radiotherapy technologies. To further meet the demand for precision medicine, the center launched its Phase II construction in 2025, planning to add particle therapy system equipment. According to the project arrangement, the heavy ion therapy system ordered this time will be equipped with 4 treatment rooms and integrate Hitachi's moving-target tracking technology and pencil-beam scanning irradiation technology.

2026-08-24

World's First Full-Stack MRI Brain-Computer Interface Solution "uMR Shenguan" Officially Released

World's First Full-Stack MRI Brain-Computer Interface Solution "uMR Shenguan" Officially Released

On August 23, the first National MRI Brain-Computer Interface Conference, themed "Integration · Decoding · Modulation — Ushering in a New Era of Brain-Computer Interaction," was held in Tianjin. At the conference, United Imaging Healthcare and Tianjin University jointly released the world's first full-stack MRI brain-computer interface solution, "uMR Shenguan." uMR Shenguan spans the entire translational chain of brain-computer interfaces from fundamental research to clinical application, advancing the realization of "understanding the brain, precise modulation, and making neural plasticity measurable and controllable." It is understood that uMR Shenguan is built on United Imaging's uMR series equipment as its hardware foundation, addressing key technical challenges in the closed loop of "reading the brain — writing the brain — verification" in brain-computer interfaces, providing a complete technical system that upgrades MRI equipment from a mere "imaging tool for structure" to a "central platform" participating in the entire brain-computer interaction process.

2026-08-24

UK Wylfa SMR project early works package valued at up to £1.1 billion

UK Wylfa SMR project early works package valued at up to £1.1 billion

Great British Energy–Nuclear (GBE-N) has launched market engagement for an early works package, with the proposed scope covering civil engineering, infrastructure, building and mechanical & electrical engineering, and earthworks. According to the prior information notice published on 20 August, the contract is estimated to be worth between £730 million and £1.1 billion. The notice states that the package falls within GBE-N's owner's scope of work, primarily intended to prepare the site for subsequent main construction and support technology partners in installing and commissioning small modular reactor (SMR) technology. Related preparatory activities include planning, permitting, design, and construction. ...

2026-08-24

Taishan Nuclear Power Achieves Full-Process Digitalization for Two Major Environmental Monitoring Inspections

Taishan Nuclear Power Achieves Full-Process Digitalization for Two Major Environmental Monitoring Inspections

Recently, the central station inspections of the Plant Environment and Meteorological Monitoring System (KRS) and the Hydrological and Water Quality Monitoring System (YSI) buoy inspections at Taishan Nuclear Power Plant have officially entered full-process digital operation, with all related inspection tasks integrated into the GFIS (Taishan Inspection Data Monitoring System) for online workflow, marking the end of the paper-based inspection sheet era. In the central station equipment room of the environmental laboratory, inspectors can complete online data entry and upload via mobile office devices after verifying data accuracy. △Inspection interface Previously, these two inspection tasks relied on paper-based recording, with inspection data manually transcribed on site and handed over offline for review, making real-time verification and sharing of information impossible. The mountains of paper forms not only made data retrieval time-consuming and laborious but also hindered equipment operation and maintenance quality assessments. Driven by the company's digital transformation initiative, these two inspection tasks have now embarked on the path of digitalization.

2026-08-24

US Boston Dynamics and UK Roke Expand Spot Robot Reconnaissance Applications for Nuclear Facilities

US Boston Dynamics and UK Roke Expand Spot Robot Reconnaissance Applications for Nuclear Facilities

US-based Boston Dynamics is expanding its collaboration with overseas specialized defense solutions companies to promote the application of its quadruped robot Spot in industrial, defense, and high-risk operational scenarios. Leveraging Spot's mature mobile platform capabilities, the company aims to further enter industry sectors with high demand for unmanned operations by integrating software systems designed for reconnaissance in hazardous environments. Boston Dynamics' quadruped robot Spot is equipped with autonomous reconnaissance software SPROCKET developed by UK-based Roke. (Image courtesy of Roke) UK defense security R&D company Roke announced on the 22nd that it has deployed Spot quadruped...

2026-08-23

Two New Members Join the "Guohe One" Industrial Chain Alliance

Two New Members Join the "Guohe One" Industrial Chain Alliance

On the afternoon of August 20, the signing ceremony for the co-construction agreement of the Guohe One Industrial Chain Alliance and the exchange meeting on new nuclear materials and technologies were held at Shanghai Research Institute of Materials Co., Ltd. Shanghai Nuclear Engineering Research and Design Institute Co., Ltd. signed the "Guohe One Industrial Chain Alliance Co-construction Agreement" with Shanghai Research Institute of Materials Co., Ltd. and Qingdao Keertai Environmental Control Technology Co., Ltd., marking the official accession of the two entities to the alliance. On the same day, the Nuclear Power Isolation, Vibration Reduction, and Wear Reduction Equipment Localization Development Center, led by Shanghai Research Institute of Materials Co., Ltd., was officially launched. The center will focus on localization development in areas such as isolation, vibration reduction, and wear reduction for key nuclear power equipment, promoting the transformation of related technologies from research and validation to engineering application.

2026-08-22

UK report calls for rebuilding nuclear power construction capability on time and on budget

UK report calls for rebuilding nuclear power construction capability on time and on budget

The UK think tank Onward recently released a report stating that if the UK hopes to achieve affordable electricity supply and drive deep decarbonization of its energy system, it must rebuild its capability to deliver nuclear power projects on time and on budget. The report, titled "Solid Foundations: The Case for Cheap, Reliable Power," proposes that the UK should adjust its renewable-dominated power system planning and build a diversified electricity mix comprising nuclear power, renewables, and gas generation, enabling consumers to access affordable electricity when needed. The UK Nuclear Industry Association (NIA) welcomed the report, noting that the issues it raises are of practical relevance. The report recognizes...

2026-08-23

South Korea Approves Restart of Shin-Kori Unit 1

South Korea Approves Restart of Shin-Kori Unit 1

The Nuclear Safety and Security Commission (NSSC) of South Korea announced on August 21 that it has approved the restart of Shin-Kori Unit 1, located in Ulju County, Ulsan. The unit has been under routine inspection since July 2. On the same day, the commission approved the unit to reach criticality. Criticality refers to the state in which a sustained nuclear fission chain reaction can be maintained within the reactor core, with a balanced neutron population. Once criticality is achieved, the reactor can gradually resume operation under safely controlled conditions. The NSSC stated that this routine inspection involved 98 inspection items required before the reactor could reach criticality, of which 86 have been completed, confirming that the unit meets the conditions for safely achieving criticality.

2026-08-22

Deaerator in Place for Unit 1 Conventional Island of Huaneng Shidao Bay Nuclear Power Expansion Project

Deaerator in Place for Unit 1 Conventional Island of Huaneng Shidao Bay Nuclear Power Expansion Project

Recently, the deaerator for Unit 1 conventional island of Phase I Expansion Project of Huaneng Shidao Bay Nuclear Power Station, undertaken by PowerChina Nuclear Engineering Company, was successfully hoisted and placed into position, marking a key milestone in the installation of conventional island equipment for the unit and creating conditions for subsequent turbine equipment installation, piping layout, and system commissioning. The Huaneng Shidao Bay Nuclear Power Base currently hosts a high-temperature gas-cooled reactor demonstration project, the world's first fourth-generation nuclear power plant to achieve commercial operation. The Phase I Expansion Project plans to build two Hualong One units, third-generation nuclear power units independently developed by China, each with a capacity of 1.225 million kilowatts. Upon completion, the project is expected to provide approximately 20 billion kilowatt-hours of clean electricity annually, reduce standard coal consumption by 5.78 million tons, and cut carbon dioxide emissions by 14 million tons.

2026-08-22

Qinshan Nuclear Power Receives On-Site Visit for WANO Enhanced Performance Monitoring and Achieves Highest Rating

Qinshan Nuclear Power Receives On-Site Visit for WANO Enhanced Performance Monitoring and Achieves Highest Rating

Recently, experts from the World Association of Nuclear Operators (WANO) Tokyo Center and Shanghai Office visited Qinshan Nuclear Power to conduct an on-site Enhanced Performance Monitoring (ePM) assessment for its nine units. Based on a comprehensive evaluation, the WANO on-site visit team unanimously concluded that Qinshan Nuclear Power has demonstrated steady overall performance improvement in recent years and currently operates at the industry's highest "benchmark" level, with expectations that performance across key areas will remain stable or continue to improve over the next six months. Additionally, WANO experts conducted follow-up evaluations on selected Areas for Improvement (AFIs) and Significant Operating Experience Report (SOER) recommendations arising from the 2025 WANO peer review of Qinshan Nuclear Power's nine units, deeming the overall results satisfactory. At a summary meeting held on August 20...

2026-08-22

UK Low-Level Waste Disposal Site STIM Project Rail Transport Completed Ahead of Schedule

UK Low-Level Waste Disposal Site STIM Project Rail Transport Completed Ahead of Schedule

The Southern Trench Interim Membrane (STIM) project at the UK's Low Level Waste Repository in Cumbria has completed its final aggregate rail deliveries, with related deliveries completed approximately one month ahead of schedule. Nuclear Waste Services (NWS) is progressing with capping works at the site, implementing long-term management of trenches and vaults used decades ago for the disposal of low-level radioactive waste. The current focus is on replacing the protective membrane above the southern trenches. This membrane reduces rainwater infiltration into the waste areas below, helping to lower environmental risks and creating conditions for the subsequent final capping of the northern trenches. The STIM project requires substantial quantities of aggregate to be placed on the trench cover. Since February 2025...

2026-08-21

West Engineering Delivers 30 Relay Protection and Automation Cabinets for Unit 2 of Akkuyu NPP

West Engineering Delivers 30 Relay Protection and Automation Cabinets for Unit 2 of Akkuyu NPP

West Engineering has completed the next stage of equipment delivery for Unit 2 of the Akkuyu Nuclear Power Plant in Türkiye, shipping 30 relay protection and automation cabinets to the project site. The equipment will be used for the protection, monitoring, and control of critical electrical components of the power unit. The delivered equipment includes AZ-PZ cabinets for generating analog and discrete information, power supply unit protection device cabinets, power unit measurement device cabinets, synchronizing relay cabinets, generator switch control cabinets, electrical process recording cabinets, and control current distribution cabinets, among others. According to reports, this batch of nuclear facility equipment has been designed with high safety margins and fault tolerance in mind. The supplied relay protection and automation systems comply with relevant international standards, with a safety class of 3H/N, meeting the NP-001-15 standard; the quality assurance category is QA3, and the equipment has undergone multi-stage quality control from material and component selection to acceptance testing.

2026-08-20

Immersive environment launched in West Cumbria to support nuclear decommissioning

Immersive environment launched in West Cumbria to support nuclear decommissioning

AtkinsRéalis has recently supported Sellafield Ltd in establishing a new immersive environment at the Robotics and Artificial Intelligence Collaboration facility (RAICo1) in West Cumbria, UK, to support the planning, rehearsal, and execution of nuclear decommissioning work. The project was developed in partnership between Sellafield Ltd and immersive technology company Igloo Vision. The new Robotics and Artificial Intelligence Collaboration (RAICo1) facility in West Cumbria (Image courtesy of Sellafield Ltd) The 360-degree visualisation environment can accommodate up to 10 users and can integrate remotely operated robotic systems, live data streams, and visual information within a single interactive space...

2026-08-20