Search Results

Keyword:Eni

Italy's Eni Plans to Build Commercial Nuclear Fusion Power Plant in Europe by Early 2040s

Italy's Eni Plans to Build Commercial Nuclear Fusion Power Plant in Europe by Early 2040s

Italian energy company Eni plans to build a commercial nuclear fusion power plant in Europe by the early 2040s or sooner. Francesca Ferrazza, head of Eni's magnetic confinement fusion project, stated that nuclear fusion technology has seen significant progress in recent years, and competition in the field is accelerating. Ferrazza said that nuclear fusion, which was previously confined mainly to the research stage, has now begun to meet the conditions for industrial application. She noted that Eni's goal is to promote the deployment of a commercial nuclear fusion power plant in Europe by the early 2040s, or even earlier. Eni has also shown interest in the extraction, purification, and recycling of spent fusion fuel back into reactors. Recently, Eni has...

2026-08-24

Portal Inspection and Screening System Tested at Chernyshevskoye Border Crossing on Russia-Lithuania Border

Portal Inspection and Screening System Tested at Chernyshevskoye Border Crossing on Russia-Lithuania Border

On August 20, the customs authorities of the Kaliningrad region of Russia, together with the equipment manufacturer, conducted functional tests of the portal inspection and screening system at the Chernyshevskoye border crossing on the Russia-Lithuania border, focusing on verifying equipment operational status and vehicle inspection capabilities. According to reports, among all Russian border crossings in the Kaliningrad region, only the Chernyshevskoye international road crossing is currently equipped with portal inspection and screening devices. A total of two systems have been installed at this crossing, used respectively for inspecting vehicles entering Russia and those departing, with both units installed and put into operation in December 2025. The inspection and demonstration were carried out with the participation of government regulatory authorities and supplier representatives. The relevant equipment is planned to be...

2026-08-22

Armenia to Select Technology Solution for New Nuclear Power Plant by End of 2027

Armenia to Select Technology Solution for New Nuclear Power Plant by End of 2027

The Armenian government has set the end of 2027 as the deadline for selecting the technology solution for a new nuclear power plant. The project will eventually replace the existing Metsamor Nuclear Power Plant and has been incorporated into Armenia's government program for 2026 to 2031. According to the program, Armenia will advance the construction project for the new nuclear power plant and complete the reactor technology selection by at least the end of 2027. At present, the government has not yet disclosed the installed capacity, reactor type, or potential contractor for the new plant. Armenia has been evaluating nuclear power options from multiple countries in recent years, including both traditional large- or medium-sized nuclear units and small modular reactors (SMRs). Armenian officials have previously stated that units of relatively smaller scale, which are easier to connect to the national grid, are one of the key areas of focus for the government.

2026-08-23

South Korea's National Assembly Passes Amendments on Radiation Disaster Response, Strengthening the Treatment System for Radiation Victims

South Korea's National Assembly Passes Amendments on Radiation Disaster Response, Strengthening the Treatment System for Radiation Victims

The South Korean National Assembly held a plenary session on the 20th and passed two livelihood bills proposed by Rep. Yoon Jun-byeong, a member of the Parliamentary Agriculture, Food, Rural Affairs and Fisheries Committee. The bills concern the establishment of a radiation disaster response system and adjustments to the support system for surviving family members of national meritorious persons. Under the amendments passed, the Korea Atomic Energy Research Institute will be granted the qualification to operate as a specialized hospital for treating radiation victims. This arrangement aims to further improve the national medical safety net, enabling industrial radiation workers and victims of accidental radiation incidents to receive faster and more systematic treatment and rehabilitation support. Meanwhile, another amendment was also passed. This amendment, in accordance with the Constitutional Court's ruling of nonconformity, abolishes the provision that prioritized age as the sole criterion in the payment of survivor benefits to families of national meritorious persons of the same rank. After the relevant institutional adjustment, greater emphasis will be placed on safeguarding the rights of low-income households to reduce blind spots in welfare support.

2026-08-21

Canada Approves Bruce Power Hot Cell Facility Operations, Strengthening Lutetium-177 Medical Isotope Supply Chain

Canada Approves Bruce Power Hot Cell Facility Operations, Strengthening Lutetium-177 Medical Isotope Supply Chain

Bruce Power has recently received approval from the Canadian Nuclear Safety Commission to operate its on-site hot cell facility for target carrier removal (TCR) work, a critical step in the production process of the medical isotope lutetium-177 (Lu-177). Lu-177 is used in the treatment of prostate cancer and is increasingly applied in targeted therapies for precision medicine. Under the approval, Bruce Power can perform the relevant processing steps on site, further streamlining the isotope production process, reducing transportation requirements, while helping to enhance operational safety, lower emissions, and strengthen Ontario's capabilities in the global medical isotope supply chain. The hot cell facility was completed earlier this year...

2026-08-20

Slovenia's Krško Nuclear Power Plant Returns to Full Power Operation

Slovenia's Krško Nuclear Power Plant Returns to Full Power Operation

On the evening of August 18, 2026, as meteorological conditions further improved, temperatures dropped, and river water temperatures declined, the Krško Nuclear Power Plant (NEK) increased reactor power to 100%, resuming full-load operation. During full-power operation, the plant will keep the entire cooling tower system in service to ensure compliance with relevant environmental limits and reduce the need for water withdrawal from the Sava River for cooling the plant's tertiary circuit. Previously, due to environmental restrictions related to the Sava River, the Krško Nuclear Power Plant reduced unit power to 80% on August 6, 2026. On August 14, following preliminary improvements in meteorological conditions, plant power was increased to 90%. Under the special operating conditions of this summer, when...

2026-08-20

US OSI Systems Secures Approximately $200 Million Contract for Mobile Vehicle Inspection Systems

US OSI Systems Secures Approximately $200 Million Contract for Mobile Vehicle Inspection Systems

On August 17, 2026, OSI Systems, Inc. announced that its Security division has been awarded a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract by U.S. Customs and Border Protection (CBP), with a ceiling value of approximately $200 million. Under the contract, OSI Systems will provide CBP with mobile Rapiscan® passenger vehicle inspection systems. The company stated that the initial task orders under the contract include the first batch of systems, along with related services and training content. Ajay Mehra, President and Chief Executive Officer of OSI Systems, stated that this contract will enable the company to continue supporting CBP in deploying vehicle security inspection systems. The Rapiscan mobile inspection systems help users flexibly allocate resources in response to changing on-site requirements, supporting border security and critical infrastructure protection efforts.

2026-08-18

Nuclear-powered icebreaker "Leningrad" completes installation of two RITM-200 reactors

Nuclear-powered icebreaker "Leningrad" completes installation of two RITM-200 reactors

United Shipbuilding Corporation (USC) announced that Baltic Shipyard has completed the installation of two RITM-200 nuclear reactors on the Project 22220 nuclear-powered icebreaker "Leningrad". The "Leningrad" is the sixth vessel in the Project 22220 nuclear-powered icebreaker series. The vessel is being built by Baltic Shipyard under an order from Rosatom, and its keel-laying ceremony was held on January 26, 2024. Project 22220 nuclear-powered icebreakers are primarily designed to ensure year-round navigation in the western Arctic waters of Russia. Equipped with nuclear propulsion systems, these vessels can perform icebreaking escort and fairway maintenance missions under complex ice conditions.

2026-08-18

Armenia Responds to Claims of Metsamor NPP Closure: Operating License Valid Until 2036

Armenia Responds to Claims of Metsamor NPP Closure: Operating License Valid Until 2036

In response to Azerbaijani President Ilham Aliyev's claims that the Metsamor Nuclear Power Plant is outdated and could pose a potential threat to the region, Arman Yeghoyan, a lawmaker from Armenia's ruling Civil Contract party, stated that the operating lifetime of a nuclear power plant is not unilaterally determined by the governments of neighboring countries. Yeghoyan noted that every nuclear power plant has an established operating period, and the Metsamor NPP is currently authorized to operate for a maximum term extending to 2036, information that has long been public. He also stated that the Armenian side has announced it is studying options for building a new nuclear power plant...

2026-08-14

Russian Scientists Develop Bioluminescent Bacterial Bioassay for Screening Safe Low-Dose Radiation Levels in Animals

Russian Scientists Develop Bioluminescent Bacterial Bioassay for Screening Safe Low-Dose Radiation Levels in Animals

Russian researchers have developed a rapid bioassay method based on bioluminescent bacteria that can be used to assess safe dose ranges of ionizing radiation for animals, providing an early screening tool for low-dose radiation applications in livestock farming. The study involved researchers from the Institute of Biophysics of the Siberian Branch of the Russian Academy of Sciences, Siberian Federal University, and Krasnoyarsk State Agrarian University. The research team noted that low-dose ionizing radiation ranging from tens to hundreds of milligrays (mGy) may activate a series of physiological processes in animals, including metabolism, growth, and biomass accumulation; however, if the dose exceeds the safe range, it may cause physiological...

2026-08-14

Construction Advances at Denison's Phoenix Uranium Project in Canada

Construction Advances at Denison's Phoenix Uranium Project in Canada

Denison Mines Corp. of Canada recently filed its quarterly and semi-annual financial documents for the period ending June 30, 2026, and disclosed the latest progress on its Phoenix uranium project construction, uranium sales, and exploration activities. According to the company's disclosure, site preparation work has continued to advance since on-site construction commenced at the Phoenix project in March 2026. To date, more than 20% of the site civil works have been completed, with roadbed civil works for the process plant and wellfield areas nearing full completion. Construction management facilities and temporary camp facilities have also been installed and put into operation. With the temporary camp now in service, accommodation capacity at the Wheeler River project site has increased to nearly 400 people, providing conditions for a larger construction workforce in the coming phases. Denison stated...

2026-08-13

Poland's First Nuclear Power Plant Enters New Phase with Deepening Polish Enterprise Participation

Poland's First Nuclear Power Plant Enters New Phase with Deepening Polish Enterprise Participation

Poland's first nuclear power plant (Lubiatowo-Kopalino site) has transitioned from the preparatory stage to substantive on-site construction. On August 12, Polish Nuclear Power Company (PEJ) officially handed over the construction site to the general contractor, American company Bechtel, while Budimex, one of Poland's largest construction firms, commenced earthworks. This marks another significant milestone for the project following the securing of financing, the refinement of the legal framework, and support from technology partners. Polish Energy Minister Miłosz Motyka stated that this investment will enhance Poland's energy security and sovereignty, while creating stable and predictable energy prices for households and businesses. To date, PEJ has signed contracts with approximately 4...

2026-08-13

Azerbaijan Says It Can Supply Electricity to Armenia, Focus on Metsamor Nuclear Power Plant Decommissioning Replacement

Azerbaijan Says It Can Supply Electricity to Armenia, Focus on Metsamor Nuclear Power Plant Decommissioning Replacement

Azerbaijani President Ilham Aliyev said on August 12 that Azerbaijan could supply electricity to Armenia. He also stated that Armenia cannot indefinitely extend the operating lifetime of the Metsamor Nuclear Power Plant. The Armenian government has not yet responded to this proposal, nor has it indicated whether it would consider importing electricity from Azerbaijan. As signs of easing relations between the two countries emerge, the possibility of cross-border transportation and energy infrastructure development is being revisited. Armenia has long relied on Russia and Iran for its energy security. Currently, the country is studying proposals from companies in the United States, Russia, China...

2026-08-13

Texas to Accelerate Opening of Sterile Fly Facility to Combat New World Screwworm Outbreak

Texas to Accelerate Opening of Sterile Fly Facility to Combat New World Screwworm Outbreak

The U.S. Department of Agriculture announced that, in response to the New World screwworm (NWS) outbreak already detected in Texas and New Mexico, the sterile fly facility at Moore Air Base in Edinburg, Texas, will open early next spring, approximately seven months ahead of the original schedule. Construction on the facility began in April of this year, and once completed, it will produce sterile flies to support outbreak control efforts using the Sterile Insect Technique (SIT). Under the plan, the facility will reach full operational capacity by the end of 2028, producing approximately 300 million sterile flies per week. The Sterile Insect Technique works by releasing sterilized flies into the environment to mate with wild screwworms, thereby interrupting the reproductive cycle and reducing the risk of continued parasite spread...

2026-08-12

US Oak Ridge National Laboratory Restarts Tungsten-188/Rhenium-188 Generator Production to Support Targeted Cancer Therapy Research

US Oak Ridge National Laboratory Restarts Tungsten-188/Rhenium-188 Generator Production to Support Targeted Cancer Therapy Research

The US Department of Energy's Oak Ridge National Laboratory (ORNL) recently restarted and upgraded its tungsten-188/rhenium-188 (W-188/Re-188) generator manufacturing operations to meet the demand for the rare medical isotope rhenium-188 in targeted cancer therapy research. The laboratory last manufactured such generators in 2011. Radiochemist Becca Hores demonstrated the assembly process of the W-188/Re-188 generator. Depending on radioactivity levels, these generators must be assembled in gloveboxes or hot cells. Image credit: Maggie Gregg/Oak Ridge National Laboratory, US Department of Energy. Rhenium-188 is produced by the radioactive decay of tungsten-188. ORNL irradiates tungsten-186 in the High Flux Isotope Reactor (HFIR) to produce tungsten-188...

2026-08-12